| 4
Wall installation
DATOR 60 VERTICAL
Equipment:
Small parts and mounting brackets are included in the packaging:
• 4 self-tapping screws 4x30;
• 4 washers;
• 4 Fischer dowels 6 mm;
• metal mounting support.
PROCEDURES
• Drill four holes in the wall, with a vertical mounting bracket, the wa-
sher and the self-tapping screw according to the order indicated
in
Fig. 5.1
;
• insert the Fischer dowel, the metal mounting bracket, the washer
and the self-tapping screw according to the order indicated in
Fig.
5.1
;
• now that the supports are secured to the wall, hang the clock inser-
ting the supports into grooves indicated by the F arrow in
Fig. 5.2
.
FIG. 5.1
FIG. 5.2
175 mm
77 mm
Содержание dator 60
Страница 1: ...Ora minuti giorno e data QUICK START GUIDE ...
Страница 3: ... 2 FIG 1 FIG 3 FIG 2a FIG 2b FIG 4 KEYPAD ...