6 Install electric heating element
7.4.4 Fit temperature sensor T1 for con-
denser
Fit temperature sensor
T1
to the primary circuit
connection set (if using the optional electric heating
element, see
)
►
Secure the sensor
1
to the brass connection
angle
2
with fabric tape.
►
Install insulation and connect with fabric tape at
connection point.
Abb. 2-35: Temperature sensor T1
7.4.5 Heat pump pipe
–
For primary circuit connection from the underside
of the heat pump, we recommend laying in the
ground with the SOLARFOCUS heat pump pipe.
–
2 dimensions available:
Dimensions and design external diameter 32
The dimensions are important for placement in the
concrete foundation
i
Connect both pipes (for bus cable and power
cable) once the electrical installation is com-
plete
Dimensions and design external diameter 40
The dimensions are important for placement in the
concrete foundation
i
Connect both pipes (for bus cable and power
cable) once the electrical installation is com-
plete
26
Installation manual
vampair
Содержание Vampair
Страница 31: ...8 Electrical connection Installation manual vampair 31 8 5 Electrical connection plan ...
Страница 39: ...10 Foundation plan Installation manual vampair 39 Side view of foundation Section A A Abb 2 48 ...
Страница 44: ...Front view of foundation Section B B Abb 2 55 11 Flat roof set up 44 Installation manual vampair ...
Страница 51: ...12 Plant schematic Installation manual vampair 51 ...