5 Installation
5 Installation
5.1 Prepare and position the boiler
5.1.1 Removing the ash container
►
Pull the bar of the retaining device upwards and
pull the ash container out toward the front.
Abb. 2-4
5.1.2 Removing the cover
►
Loosen the 4 screws and remove the cover
1
.
5.1.3 Removing the boiler door
►
Pull the small tab underneath the fitting (see fig.).
Ä
The hinge is released from the fixture.
Abb. 2-5
5.1.4 Removing the disposable pallet
►
Remove the 4 x mounting brackets of the boi-
ler/pallet.
►
Optional: Fit the lifting aid
to the boiler.
►
Lift/move the boiler from the pallet.
5.1.5 Placement of the boiler
i
If the boiler is extended for room-sealed ope-
ration
, fit the required parts before posi-
tioning the boiler.
i
During placement of the boiler, observe the
required minimum distances
16