 4.  Remove the rubber fitting from the gland and insert the CAT5/6 cable through the gland and through 

the gland opening in the inverter .

 5.  Push the cable into the cut opening of the rubber fitting.

Figure 35: Rubber fitting

CAT5/6 standard cables have eight wires (four twisted pairs), as shown in the diagram below. Wire colors 
may differ from one cable to another. You can use either wiring standard, as long as both sides of the 
cable have the same pin-out and color-coding.

RJ45 Pin #

Wire Color

1

10Base-T Signal

100Base-TX Signal

T568B

T568A

1

White/Orange

White/Green

T

2

Orange

Green

Transmit-

3

White/Green

White/Orange

4

Blue

Blue

Reserved

5

White/Blue

White/Blue

Reserved

6

Green

Orange

Received-

7

White/Brown

White/Brown

Reserved

8

Brown

Brown

Reserved

Figure 36: Standard cable wiring

 6.  Use a pre-crimped cable to connect via gland #1 to the RJ45 plug on the inverter's communication 

board or, if using a spool of cable, connect as follows:

 a.  Insert the cable through gland #1.

 b.  Remove the cable’s external insulation using a crimping tool or cable cutter and expose eight 

wires.

 c.  Insert the eight wires into an RJ45 connector, as described in 

Figure 36

 d.  Use a crimping tool to crimp the connector.

 e.  Connect the Ethernet connector to the RJ45 port on the communication board.

1

The inverter connection does not support RX/TX polarity change. Supporting crossover Ethernet cables depends on the 

switch capabilities.

SolarEdge

-

StorEdge Installation Guide MAN-01-00262-1.3

76

Creating an Ethernet (LAN) Connection

Содержание StorEdge SE7600A-US1

Страница 1: ...SolarEdge StorEdge Solution with Backup Installation Guide For North America Version 1 3 ...

Страница 2: ...450V DC to BAT connector DC and DC connections corrected in the connection diagram o Added a diagram of LG battery connection to inverter with 3 DIP switches l In Configuration Menu Options o Power Controlsection n Removed Phase Balance link and info n Added a note about compliance with UL1741Supplement A n Added link to P Q diagram application note o Maintenance section n Added links to applicati...

Страница 3: ... only and may vary depending on product models FCC Compliance This equipment has been tested and found to comply with the limits for a Class B digitaldevice pursuant to part 15of the FCC Rules These limits are designed to provide reasonable protection against harmful interference in a residentialinstallation This equipment generates uses and can radiate radio frequency energy and if not installed ...

Страница 4: ...oper Power Optimizer Connection 19 Chapter 3 Installing the Inverter 20 Inverter Package Contents 20 Identifying the Inverter 20 Inverter Interfaces 21 Connection Unit 22 InternalAC Breaker and Bypass Switch 23 Mounting the Inverter 23 Chapter 4 Auto transformer and Backed up Loads Panel Installation for Backup 27 Mounting the Auto transformer 28 Installing the Backed up Loads Panel 28 Chapter 5 M...

Страница 5: ...ter Using the LCD User Buttons 54 Configuring the Inverter Using the LCD Light Button 57 Configuration Menu Options 60 Country and Grid 60 Language 60 Communication 60 Power Control 62 Display 63 Maintenance 63 Information 64 Status Screens OperationalMode 65 InitialStatus 65 Main Inverter Status 65 Energy Meter Status 65 Telemetry Status 66 ID Status 66 Server Communication Status 67 IP Status 67...

Страница 6: ...roubleshooting Ethernet Communication 93 Meter Troubleshooting 94 OK is not displayed 94 An error message is displayed 94 Power Wh Import value is not advancing 94 Battery Troubleshooting 95 Power Optimizer Troubleshooting 96 Connection Unit LEDs 97 AdditionalStorEdge Troubleshooting 98 StorEdge related Errors Codes 100 System Warnings 101 Appendix B Opening Conduit Drill Guides 102 Appendix C Rep...

Страница 7: ...edure that if not correctly performed or adhered to could result in injury or loss of life Do not proceed beyond a warning note until the indicated conditions are fully understood and met CAUTION Denotes a hazard It calls attention to a procedure that if not correctly performed or adhered to could result in damage or destruction of the product Do not proceed beyond a caution sign until the indicat...

Страница 8: ...L unité ne doit être ouverte que par un technicien qualifié dans le cadre de l installation et de la maintenance WARNING The Connection Unit meets all requirements for a code compliant installation of this system The DC Disconnect Switch disconnects both the positive and negative conductors Le sectionneur externe inclus repond aux exigences de conformité pour l installation de ce système Le coupeu...

Страница 9: ...und fault protection NOTE The symbol appears at grounding points on the SolarEdge equipment This symbol is also used in this manual NOTE A SolarEdge inverter may be installed in a site with a generator however must not operate at the same time as the generator Operating an inverter and a generator simultaneously will void the warranty SolarEdge requires installing a physical or electronic interloc...

Страница 10: ...tre étteinte avant et pendant le câblage Fermer l Le commutateur d alimentationauxiliaire l Le commutateur ducoupeur CAUTION This unit must be operated under the specified operating conditions as described in the technical specifications supplied with the unit Cette unité doit être opérée suivant les instructions trouvées dans le manuel fourni avec le produit NOTE The battery used must be NRTL cer...

Страница 11: ...o StorEdge inverter for Single Battery or High Capacity o StorEdge inverter for High Power The Connection Unit located at the bottom of the inverter allows simple installation and connectivity to other system components and includes a DC Safety Switch l The SolarEdge Electricity Meter The meter is used by the inverter for export consumption readings and for Smart Energy Management applications suc...

Страница 12: ... Optional ü Battery ü ü ü NOTE l Additional SolarEdge inverters without batteries can be connected with RS485 The inverters will participate in export limitation and Smart Energy Management Connecting multiple inverters with RS485 master slave connection may require an RS485 Expansion Kit available from SolarEdge l PV modules connected to power optimizers are not mandatory for charge discharge pro...

Страница 13: ...gs tothe Inverter on page 33 Step 5 Connecting the battery to the inverter and mounting the battery Refer to the installation information in the manufacturer documentation and to StorEdge Inverter Connections on page 30 Step 6 Connecting all components to the inverter connect the auto transformer and loads AC PV strings DC and meter Refer to StorEdge Inverter Connections on page 30 Step 7 Commissi...

Страница 14: ...nting bracket to the mounting surface o the power optimizer to the racking not required for smart modules l Wire cutters l Wire strippers l Voltmeter For installing the communication options you may also need the following l For Ethernet o CAT5 6twisted pair Ethernet cable with RJ45connector o If using a CAT5 6cable spool RJ45plug and RJ45crimper l For RS485 o Four or six wire shielded twisted pai...

Страница 15: ...t be submerged in water Les optimiseurs de puissances sont compatibles à la norme IP68 NEMA6P Choisissez le lieu de montage tel que l optimiseur ne puisse pas être submergé par l eau CAUTION This unit must be operated according to the operating specifications provided with the unit Cette unité doit être opérée suivant les instructions trouvées dans le manuel fourni avec le produit CAUTION Cutting ...

Страница 16: ...n of frame mounted power optimizers refer to http www solaredge com sites default files installing_ frame_mounted_power_optimizers pdf l The steps in this chapter refer to module add on power optimizers For smart modules start from Also refer to the documentation supplied with the smart modules l The power optimizer can be placed in any orientation l To allow for heat dissipation maintain a 2 5cm ...

Страница 17: ...lteraient peuvent endommager la optimiseur de puissance 3 Attach each power optimizer to the rack using the M6 1 4 stainless steelbolts nuts and washers or other appropriate mounting hardware Apply torque of 9 5N m 7 lb ft For 3NA series power optimizes SolarEdge recommends mounting the power optimizer on a railwith the smooth side facing out so that the power optimizer body willprevent its rotati...

Страница 18: ... bracket Use mounting specific hardware as needed Apply torque of 9 5N m 7 lb ft See Figure 3 Figure 3 Power optimizer installation and grounding using a grounding plate l For mounting on un grounded structures such as a wooden structure If the star washer or the plate cannot be used use the SolarEdge grounding lug purchased separately with an equipment grounding conductor according to the supplie...

Страница 19: ...imizer NOTE Images are for illustration purposes only Refer to the label on the product to identify the plus and minus input and output connectors For each of the power optimizers l Connect the Plus output connector of the module to the Plus input connector of the power optimizer l Connect the Minus output connector of the module to the Minus input connector of the power optimizer Figure 5 Power o...

Страница 20: ... optimizers in the string in the same manner Figure 6 Power optimizers connected in series 3 If you intend to monitor the installation using the SolarEdge monitoring platform record the physicallocation of each power optimizer as described in ProvidingInstallationInformationon page 51 WARNING Input and output connectors are not watertight until mated Open connectors should be mated to each other o...

Страница 21: ...nd the open circuit voltage VOC hold different meanings from those in traditionalsystems For more information about the SolarEdge system s string voltage and current refer to the VOC andISC inSolarEdge Systems TechnicalNote available on the SolarEdge website at http www solaredge us files pdfs isc_and_voc_in_solaredge_systems_technical_ note pdf To verify proper power optimizers connection Measure...

Страница 22: ...on card l One 9V battery l Allen key for opening the Connection Unit l Installation guide with activation card and instructions Identifying the Inverter Refer to the sticker on the inverter that specifies its Serial Number and its Electrical Ratings Provide the serialnumber when contacting SolarEdge support The serialnumber is also required when opening a new site in the SolarEdge monitoring platf...

Страница 23: ...rning it OFF reduces the power optimizer voltage to a low safety voltage and inhibits exportation of power When this switch is OFF the inverter controlcircuitry remains powered up l LCD panel displays inverter information and configuration parameters l LCD LEDs Three LEDs indicate the following inverter statuses Color Description Functionality Green Power production On The inverter is producing po...

Страница 24: ...conductors of the PV and the positive and negative conductors of the battery l Openings for conduit entry Four openings are ready to use and have sealing covers Two openings are closed with drillguides If required open the drillguides as described in OpeningConduit DrillGuides on page 102 SolarEdge StorEdge Installation Guide MAN 01 00262 1 3 22 ConnectionUnit ...

Страница 25: ...ality and use of each position Switch position Use Case Functionality 1 left Default Normal operation Normal operation The backed up loads panel is connected through the software controlled switches to the AC grid during normal operation or to the inverter via auto transformer for backup power 2 right AC bypass This mode disables the backup functionality The backed up loads panel is connected dire...

Страница 26: ...ers side by side leave 8 20cm between inverters 2 Position the mounting bracket against the wall pole and mark the drilling hole locations o Ensure that the flat edge of the bracket is at the bottom as in Figure 12 o Use at least two bracket holes Additionalholes can be used to fix the bracket Determine which and how many holes to use according to mounting surface type and material 3 Drillthe hole...

Страница 27: ... Fasten the bracket using a standard bolt l Verify that the bracket is firmly attached to the mounting surface Figure 13 Connection Unit bracket 7 Insert the two supplied screws through the outer heat sink fin on both sides of the inverter and into the bracket see Figure 12 Tighten the screws with a torque of 4 0N m 2 9lb ft 8 Remove the inverter cover Open the inverter cover s six Allen screws an...

Страница 28: ...he Connection Unit externalcover to the enclosure and lift the cover b Open the four internalscrews securing the transparent cover to the enclosure and remove the cover Figure 14 Inverter Covers SolarEdge StorEdge Installation Guide MAN 01 00262 1 3 26 Mountingthe Inverter ...

Страница 29: ...ations only Refer to the table on page 10 The auto transformer connects to the AC side of the inverter Since the inverter AC connections are on its right side it is recommended to position the auto transformer to the right of the inverter to simplify wiring Chapter 4 Auto transformer andBacked upLoads PanelInstallation for Backup SolarEdge StorEdge Installation Guide MAN 01 00262 1 3 27 ...

Страница 30: ...acket Lift the auto transformer from the sides or hold it at the top and bottom to lift the unit into place 4 Insert the two supplied screws through the outer heat sink fin on both sides of the auto transformer and into the bracket Tighten the screws with a torque of 4 0N m 2 9lb ft Figure 15 Installing the auto transformer Installing the Backed up Loads Panel l Installa secondary AC panelfor back...

Страница 31: ... RS485wiring specifications l Cable type Min 3 wire shielded twisted pair a shielded Ethernet cable Cat5 5E STP may be used l Wire cross section area 0 2 1 mm 24 18AWG a CAT5cable may be used NOTE The inverter RS485 bus should be connected to the battery and meter Connecting multiple inverters with RS485 master slave connection may require an RS485 Expansion Kit available form SolarEdge Refer to h...

Страница 32: ...ings must be suited for field wiring systems l The hubs and other fittings must comply with UL514B l Use the conduit and wiring appropriate for the installation location per the NEC l Outdoor installations must use components that are rated NEMA 3R or higher SolarEdge StorEdge Installation Guide MAN 01 00262 1 3 30 Chapter 6 StorEdge Inverter Connections ...

Страница 33: ...e following figure shows the connections in the Connection Unit Figure 17 The Connection Unit connections Chapter 6 StorEdge Inverter Connections SolarEdge StorEdge Installation Guide MAN 01 00262 1 3 31 ...

Страница 34: ...ard of the Connection Unit and connect it to the battery pad Figure 18 The battery holder Two 25A fuses are supplied with the high power inverters Installthe fuses in the holders on the top board of the Connection Unit Figure 19 Connection Unit fuses SolarEdge StorEdge Installation Guide MAN 01 00262 1 3 32 Installingthe 9V Battery andFuses ...

Страница 35: ...elease the screwdriver to spring back and clamp the wire Check that the wire is fully inserted and cannot be pulled out easily CAUTION Ensure that the Plus wire s is connected to the terminal and that the Minus wire is connected to the Minus terminal connector Veillez à ce que le câble s Plus soit connecté au terminal et que le câble soit connecté au terminal NOTE For systems with four PV strings ...

Страница 36: ...ecessary length between the Connection Unit and the battery for allcables The maximum distance between the battery and the inverter is 35ft 10m when using 24AWG 0 2mm2 cables for battery control l Tie and wrap the cables to avoid pulling them out during mounting l Be sure to adhere to allsafety cautions and information in the battery documentation l The battery connects to the DC side of the inver...

Страница 37: ...he round opening and release the screwdriver to spring back and clamp the wire DC cable 10 AWG 10 14 AWG 600V insulated BAT terminal block DC Control and monitoring 5 pin communication terminal block 6 pin connector Press the protrusion at the top of the terminal block to open the connection hole insert the wire and release to spring back and clamp the wire 5 wire shielded twisted pair cable 24 AW...

Страница 38: ...Figure 21 Connections to LG Chem RESU10H battery Connection Unit with three DIP switches Connectingtothe Battery SolarEdge StorEdge Installation Guide MAN 01 00 262 1 3 36 ...

Страница 39: ...Figure 22 Connections to LG Chem battery Connection Unit with two DIP switches SolarEdge StorEdge Installation Guide MAN 01 00 262 1 3 37 Connectingtothe Battery ...

Страница 40: ...almeter in the RS485chain should be terminated with 120Ohm either internalor external l Inverter communication board Figure 23 o If a meter is installed No termination Left SW7switch Down o If a meter is not installed termination ON Left SW7switch Up see also CreatinganRS485Bus Connectionon page 77 Figure 23 RS485 termination switch on the inverter communication board SolarEdge StorEdge Installati...

Страница 41: ... auto transformer or auto transformer with over temperature sensor not connected ON up default ON up l In Connection Unit with three DIP switches Hardware configuration DIP switch 1 leftmost setup DIP switch 2 center setup DIP switch 3 rightmost setup Auto transformer with connected over temperature sensor ON up default ON up default OFF down default No auto transformer or auto transformer with ov...

Страница 42: ... guide supplied with the meter Recommended cable type min max AWG Connection Unit Meter connection RS485 24 AWG 16 24 AWG shielded twisted pair 600V insulated Ext Devices 7 pin terminal block B A G RS485 4 pin terminal block B A G Connect as illustrated below Figure 25 Connection to a meter SolarEdge StorEdge Installation Guide MAN 01 00262 1 3 40 ConnectingCommunicationtothe Meter ...

Страница 43: ...in the following table Recommended cable type min max AWG Connection Unit connection Auto transformer connection Connection method AC 8 AWG 6 20 AWG 3 pin terminal block L1 Line terminal L1 Insert the wire into the round opening and push to clamp the wire 3 pin terminal block L2 Line terminal L2 3 pin terminal block N Neutral terminal N Grounding 10 AWG cable Grounding Bus bar Grounding lug Chapte...

Страница 44: ...ock to open the connection hole insert the wire and release to spring back and clamp the wire Auto transformer o Insert a flat blade screwdriver into the square opening at the top of the terminal block and press to open clamp mechanism o Insert the wire into the round opening and release the screwdriver to spring back and clamp the wire External Devices 7 pin terminal block T2 Temperature sensor t...

Страница 45: ...wing table Recommended cable type min max AWG Connection Unit con nection External connection Grid 6 AWG 4 20 AWG 3 pin terminal block Grid L1 Main distribution panel L1 3 pin terminal block Grid L2 Main distribution panel L2 3 pin terminal block Grid N Main distribution panel N Min 10 AWG grounding wire to ground Backed up loads panel 6 AWG 4 20 AWG 3 pin terminal block L1 Backed up loads panel L...

Страница 46: ...was operating properly power was produced by the power optimizers the following message is displayed D C V O L T A G E N O T S A F E D O N O T D I S C O N N E C T V D C 7 2 0 This message is displayed until the DC voltage is safe 50V Do not open the cover until the voltage is safe or until at least five minutes have passed La tension de sécurité par défault est de 50V Ne pas ouvrir le couvercle ou...

Страница 47: ... to damage internal components SolarEdge will not be held responsible for any components damaged as a result of incautious cover removal Lors du retrait du couvercle assurez vous de ne pas endommager les composants internes SolarEdge ne peut être tenue pour responsable des composants endommagés à la suite d une imprudence dans le retrait du couvercle Chapter 7 Commissioningthe Installation SolarEd...

Страница 48: ...ify that the card S N matches the inverter S N b Insert the card into the CARD slot on the communication board c Turn ON the AC switch of the main circuit board d LCD shows Running Script è Done Figure 28 Activation card If LCD shows Failed l Turn AC OFF and ON reset and repeat the activation process l Use the activation code that appears on the certification inverter labelto manually activate the...

Страница 49: ...nfiguration refer to SystemConfigurationon page 81 7 Close the inverter cover by tightening the screws with a torque of 9 0N m 6 6lb ft For proper sealing first tighten the corner screws and then the two centralscrews The following figure illustrates recommended order Figure 29 Tightening order of the screws 8 Close the Connection Unit internalcover Attach the cover and secure it by tightening the...

Страница 50: ...the power optimizers Indicates connection to the power optimizers and that at least one power optimizer is sending monitoring data l 000 000 Appears only upon first telemetry reception from the power optimizers Indicates the number of power optimizers that have been paired to this inverter l S_OK The connection to the SolarEdge monitoring platform is successful should appear only if the inverter i...

Страница 51: ... Wait for the completion of the pairing remaining seconds is 0 If pairing fails an error is displayed In this case repeat the pairing steps and refer to Power Optimizer Troubleshooting on page 96 If the problem persists contact SolarEdge Support When pairing succeeds the following message is displayed P a i r i n g P a i r i n g C o m p l e t e d The system startup process begins Since the inverte...

Страница 52: ...he AC output power produced 2 Take note of the serialnumber on the inverter labelusing the detachable 2D barcode sticker on each device This information is used in the SolarEdge monitoring platform to identify this inverter Your SolarEdge power harvesting system is now operational Step 4 Reporting and Monitoring Installation Data NOTE This step requires connecting one of the communication options ...

Страница 53: ...arEdge monitoring platform willshow the logicallayout indicating which power optimizers are connected to which inverter but willnot show strings or the physicallocation of power optimizers The inverter may be connected to the SolarEdge monitoring platform via LAN or using a SolarEdge ZigBee Home Gateway system or a SolarEdge Cellular Modem Alternatively you can connect the inverter to another inve...

Страница 54: ... the SolarEdge Monitoring Platform Create the site in the monitoring platform using the registration form available at https monitoring solaredge us solaredge web p login Fillout allrequired information in the form which includes information about your installation as wellas details about its logicaland physicalmapping Paper Template Fillout the PhysicalLayout Template downloadable from the SolarE...

Страница 55: ...nd accepts a value change with a long press untilApplied is displayed The LCD screen displays status information of the system and various menus for configuration options The LCD paneland buttons are used during the following processes l Operational mode The LCD panelallows checking for proper system operation Refer to Status Screens OperationalMode on page 65for a description of this option l Set...

Страница 56: ...age is safe 50V Do not open the cover until the voltage is safe or until at least five minutes have passed La tension de sécurité par défault est de 50V Ne pas ouvrir le couvercle ou les connecteurs DC jusqu à ce que la tension soit affichée comme sécurisé ou jusqu à ce que cinq minutes au moins se soient écoulées 2 Press the Enter button for at least 5 seconds The following message is displayed P...

Страница 57: ...m m u n i c a t i o n P o w e r C o n t r o l B a c k u p C o n f D i s D i s p l a y M a i n t e n a n c e I n f o r m a t i o n Country U S A Language E n g l i s h G e r m a n S p a n i s h F r e n c h I t a l i a n Communication S e r v e r L A N L A N C o n f R S 4 8 5 1 C o n f S R S 4 8 5 2 C o n f S Z i g B e e C o n f S C e l l u l a r C o n f R S 2 3 2 C o n f G P I O C o n f M T R Chapt...

Страница 58: ...e C L C D O n T i m e 3 0 T L M O n T i m e 1 5 Maintenance D a t e a n d T i m e R e s e t C o u n t e r s F a c t o r y R e s e t F W U p g r a d e A F C I D i s D i a g n o s t i c s S t a n d b y M o d e G r i d P r o t e c t i o n B o a r d R e p l a c e m e n t Information V e r s i o n s E r r o r L o g W a r n i n g l o g H a r d w a r e I D s SolarEdge StorEdge Installation Guide MAN 01 0...

Страница 59: ...ssage is displayed K e e p h o l d i n g b u t t o n f o r p a i r i n g r e l e a s e t o e n t e r m e n u R e m a i n i n g 3 s e c Releasing the button displays the following menu O p t i m i z e r p a i r i n g L a n g u a g e e n g C o m m u n i c a t i o n M a i n t e n a n c e I n f o r m a t i o n E x i t 3 Short press one second to scrolldown to the next menu option and long press three ...

Страница 60: ... F r e n c h I t a l i a n E x i t Communication1 S e r v e r L A N L A N C o n f R S 4 8 5 1 C o n f S Z i g B e e C o n f S W i F i C o n f N A G P I O C o n f M T R R S 2 3 2 C o n f C e l l u l a r C o n f E x i t Information V e r s i o n s E r r o r L o g W a r n i n g l o g H a r d w a r e I D s E x i t 1If Wi Fi is connected the ZigBee Conf menu is not displayed and vice versa SolarEdge St...

Страница 61: ... i s M a n u a l A F C I T e s t D i a g n o s t i c s S t a n d b y M o d e O p t i m i z e r C o n f G r i d P r o t e c t i o n B o a r d R e p l a c e m e n t E x i t The options presented in these menus are described in the next section Chapter 8 User Interface SolarEdge StorEdge Installation Guide MAN 01 00262 1 3 59 ...

Страница 62: ... country selection in the confirmation screen Toggle to YES and press Enter Language 1 Select the Language option to set the language in which the LCD should display 2 Confirm your language selection in the confirmation screen Toggle to YES and press Enter Communication 1 Select the Communication option to define and configure l The communication option used by the inverter to communicate with the...

Страница 63: ... e LAN Conf I P C o n f i g S e t D H C P e n S e t I P S e t M a s k S e t G a t e w a y S e t D N S S e t S e r v e r A d d r S e t S e r v e r P o r t M o d b u s T C P D i s 1When using the SolarEdge Cellular Modem with the provided SIM card the Cellular Conf menu is unavailable 2When using the SolarEdge GSM products RS232 Conf menu is unavailable Chapter 8 User Interface SolarEdge StorEdge In...

Страница 64: ...GPIO Conf D e v i c e T y p e R R C R Power Control For detailed information about active and reactive power controloptions refer to the Power ControlApplicationNote available on the SolarEdge website at http www solaredge us files pdfs application_note_power_control_ configuration pdf G r i d C o n t r o l E n E n e r g y M a n a g e r R R C R C o n f R e a c t i v e P w r C o n f A c t i v e P w...

Страница 65: ...ds l TLM On Time 15 The number of minutes that the LCD backlight is ON while viewing the Telemetry window Set a value within the range of 1 120minutes Maintenance Select Maintenance to set the following options D a t e a n d T i m e R e s e t C o u n t e r s F a c t o r y R e s e t F W U p g r a d e A F C I D i s D i a g n o s t i c s S t a n d b y M o d e G r i d P r o t e c t i o n B o a r d R e...

Страница 66: ...g to the instructions supplied with replacement kits Information Select Information to display the following options V e r s i o n s E r r o r L o g W a r n i n g l o g H a r d w a r e I D s l Versions Displays inverter firmware versions o ID The inverter ID o DSP 1 2 The DSP digitalcontrolboard firmware version o CPU The communication board firmware version NOTE Please have these numbers ready wh...

Страница 67: ...mperature Energy Meter Status Displays the totalenergy produced during the last day month year and since inverter installation D a y W h 0 0 M o n t h K W h 0 0 Y e a r K W h 0 0 T o t a l K W h 0 0 l Day since midnight l Month since 1st of the current month untiltoday inclusive l Year since January 1st untiltoday inclusive If a meter RGM is connected to the inverter the following status screen sh...

Страница 68: ...nitoring platform NOTE This data is accumulated according to an internal real time clock Telemetry Status This screen displays the last power optimizer telemetry received The display changes as each power optimizer sends its telemetry In order to verify proper installation the installer may view the Telemetry window for some time in order to observe the power optimizers report process M o d u l e ...

Страница 69: ...nnected to the server l Status Displays OK if the inverter established successfulconnection and communication with the specified server port LAN RS485or ZigBee card l xxxxxxxx Eight bit Ethernet communication connection status A string of 1s and 0s is displayed 1 indicates OK 0 indicates an error For a list of the possible errors and how to troubleshoot them refer to CommunicationTroubleshootingon...

Страница 70: ...lished a successfulphysicalconnection to the Cellular modem l S_OK The last communication to the SolarEdge monitoring platform was successful appears if the inverter is connected to the platform l Sig The signalstrength received from the cellular modem A value between 0 5 0 no signal 5 excellent signal l Error message per communication connection status failure GSM Status If a GSM modem is connect...

Страница 71: ...icationnote ConnectinganElectricity Meter toSolarEdge Devices at http www solaredge com files pdfs solaredge meter installation guide na pdf o SS SunSpec for a non SolarEdge logger monitoring and control Smart Energy Management Status This screen is displayed only when Smart Energy Management is enabled The screen shows energy details of the site S i t e L i m i t 7 0 k W S i t e P r o d 1 0 0 k W...

Страница 72: ... P U o Q U l Cos Phi The ratio between active to reactive power l Power Prod The power produced by the inverter For more information refer to the Power ControlApplicationNote available on the SolarEdge website at http www solaredge us files pdfs application_note_power_ control_configuration pdf Battery Status This screen is displayed only when the battery is configured and shows the battery identi...

Страница 73: ... m o t e S e t U n t i l d a t e l Name The TOU profile file name l Last Sync Date when the time of use profile was loaded from the monitoring platform l Source the source from which the TOU profile was uploaded o Remote Profile uploaded from the SolarEdge monitoring platform o Local Profile uploaded from an SD card l Set Until The date untilthe current profiles applicable Chapter 8 User Interface...

Страница 74: ...he ON OFF switch at the bottom of the inverter is turned OFF and the AC is turned OFF When configuring the communication parameters make sure that the ON OFF switch is OFF and the AC is turned ON Lors de la connexion des câbles de communication assurez vous que l interrupteur MARCHE ARRÊT à la base de l onduleur soit en position ARRÊT et le CA est en position ARRÊT Lors de la configuration des par...

Страница 75: ...he communication board and has a 3 pin RS485terminalblock This Kit is provided with an installation guide which should be reviewed prior to connection see https www solaredge com sites default files RS485_ expansion_kit_installation_guide pdf For connection instructions refer to CreatinganRS485Bus Connectionon page 77 ZigBee This option enables wireless connection of one or severaldevices to a Zig...

Страница 76: ...e openings The table below describes the functionality of each opening Unused openings should remain sealed Gland Opening Functionality Cable Size diameter 1 PG16 One small External antenna cable 2 4 mm Two large Ethernet connection CAT5 6 ZigBee Cellular 4 5 7 mm 2 PG13 5 All three RS485 power reduction 2 5 5 mm Figure 32 Communication Glands The communication board has a standard RJ45terminalblo...

Страница 77: ...iles rs485_surge_protection_kit_ installation_guide pdf If not using surge protection connect the grounding wire to the first inverter in the RS485 chain make sure the grounding wire is not in contact with other wires Connect the grounding wire to the grounding bus bar in the Connection Unit Figure 34 Example of Ethernet connection To connect the Ethernet cable 1 Remove the inverter cover as descr...

Страница 78: ... White Blue White Blue Reserved 6 Green Orange Received 7 White Brown White Brown Reserved 8 Brown Brown Reserved Figure 36 Standard cable wiring 6 Use a pre crimped cable to connect via gland 1to the RJ45plug on the inverter s communication board or if using a spoolof cable connect as follows a Insert the cable through gland 1 b Remove the cable s externalinsulation using a crimping toolor cable ...

Страница 79: ...page 60 NOTE If your network has a firewall you may need to configure it to enable the connection to the following address l Destination Address prod solaredge com l TCP Port 22222 22221 or 80 for incoming and outgoing data 10 Verify the connection as described in Verifyingthe Connectionon page 80 Creating an RS485 Bus Connection The RS485option enables creating a bus of connected inverters consis...

Страница 80: ...re to the grounding bus bar in the Connection Unit NOTE An additional RS485 port RS485 E is available from SolarEdge allowing configuration of multiple RS485 buses for communications in large sites Refer to http www solaredge us files pdfs RS485_expansion_kit_installation_guide pdf The following sections describe how to physically connect the RS485bus and how to configure the bus To connect the RS...

Страница 81: ...llB pins and the same color for allG pins 6 For creating an RS485bus connect allB A and G pins in allinverters The following figure shows this connection schema Figure 40 Connecting the inverters in a chain NOTE Do not cross connect B A and G wires 7 Tighten the terminalblock screws 8 Check that the wires are fully inserted and cannot be pulled out easily 9 Push the RS485terminalblock firmly allth...

Страница 82: ... and configuring a communication option perform the following steps to check that the connection to the monitoring server has been successfully established 1 Close the inverter cover Attach the inverter cover and secure it by tightening the screws with a torque of 9 0N m 6 6lb ft For proper sealing first tighten the corner screws and then the two centralscrews 2 If not already ON Turn ON the AC to...

Страница 83: ...e version is available for download at http solaredge com storedge firmware Upgrading the Inverter Firmware Version Upgrade the inverter firmware using a MicroSD card with the latest firmware version downloaded from the above link To upgrade the inverter firmware 1 Make sure that l The inverter has been activated using the activation card supplied with the inverter l The inverter ON OFF switch is ...

Страница 84: ... section describes how to set up the RS485communication between the inverter meter and one battery For information on configuring two batteries refer to the StorEdge Applications ConnectionandConfigurationGuide available at http www solaredge com sites default files storedge_applications_connection_and_ configuration_guide_na pdf Some inverters are equipped with a built in Revenue Grade Meter RGM ...

Страница 85: ...0 M e t e r F u n c N o n e T o p o l o g y W y e 5 Configure the meter a Select Device Type è Revenue Meter b Select Protocol è WattNode c Verify that Device ID is set to 2 d Set the CT value that appears on the CT label CT Rating è xxxxA If CT resets to 0 check the communication as described in step b of verify the connection below e For a meter installed at the grid connection point select Mete...

Страница 86: ...attery Pack 8 To verify battery connection select Battery Info and check that the battery information is displayed If not check the wiring to the battery S N s e r i a l M o d e l X X X X X X N a m e p l a t e k W H N A F W V e r X X X X X Make sure to have the battery serialnumber and firmware version at hand whenever contacting support SolarEdge StorEdge Installation Guide MAN 01 00262 1 3 84 Co...

Страница 87: ... installed the screen should show 3 3 If the number of devices under Prot does not match the number under refer to Troubleshootingon page 93 b Check the meter s In the meter s status screen check that the status is OK The following is an example of the status of an Export or Export Import meter E x p o r t M e t e r S t a t u s O K E r r o r P o w e r W x x x x x x E n e r g y W h X X X X X X If C...

Страница 88: ...ation_guide_na pdf The Backup application can be used whether or not PV modules are installed at the site The backup function is disabled by default and can be enabled for on grid only application if backup is not needed System Basic Configuration This section describes l How to enable the BackupConfigurationfunctionality so that the system can be set up to the available applications Backup only o...

Страница 89: ...nergy control For more information refer to http www solaredge us files pdfs products export_limitation_application_note_NA pdf o E Export limit o P Production limit o I Minimum import o Dis Disabled no limit Energy Control The method by which to manage the energy Storage Control Enables reserving a minimum battery charge level Advanced For enabling externalproduction 3 Select Energy Ctrl The foll...

Страница 90: ... C t r l M S C S e t O p e r a t i o n S t o r a g e C t r l 3 Optionally set the battery OFF periods as follows a Select Set Operation A list is displayed allowing 12monthly profile setup J a n O N F e b O N M a r O N A p r O N b Select a month A list of options is displayed S t a r t T i m e 0 0 0 0 E n d T i m e 0 0 0 0 A l w a y s O N A l w a y s O F F c Select one of the options l Select Alwa...

Страница 91: ...f charging the battery from AC Then you set up the levelof stored energy to be reserved for backup To set up Charge Discharge Profile TOU Backup Power 1 Access the Energy Ctrl menu as described above 2 Select Time of Use The Energy Manager screen changes to display the following L i m i t C o n t r o l D i s E n e r g y C t r l T O U S e t C a l e n d a r S t o r a g e C o n t r o l 3 From the Ene...

Страница 92: ...93 To check the meter and inverter 1 Verify that AC is ON 2 Check the meter installed in export or consumption position CT arrows point to the grid a Turn the inverter ON OFF switch to OFF b Connect loads on one of the measured phases c Press the externalLCD light button to display the Import or Consumption meter status screen and check that the import or consumption energy Energy Wh is greater th...

Страница 93: ...e AC back ON from the main distribution panel The inverter should reconnect loads back to the grid To check Maximize Self consumption mode 1 Verify the inverter ON OFF switch is ON 2 Turn on as many loads so that consumption is greater than the inverter s maximum AC power 3 Press the inverter LCD light button to display the Meter status screen and check that import power is greater than zero I m p...

Страница 94: ...t the Meter status screen is displaying import power close to zero c Press the externalLCD light button to display the Battery status screen and check that l State Charging l SOE percentage is increasing l PWR 0 B S N X X X X X X X X X I D 2 4 S O E 8 9 W W W W W P W R 2 W T o t a l x W h S t a t e C h a r g i n g SolarEdge StorEdge Installation Guide MAN 01 00262 1 3 92 VerifyingStorEdge Componen...

Страница 95: ...d meter are configured and communicating properly Troubleshooting Ethernet Communication When using Ethernet communication use the Server Communication Status window to identify the location of the error S e r v e r L A N S _ O K S t a t u s O K x x x x x x x x E R R O R M E S S A G E xxxxxxxx is a string of 1s and 0s showing an eight bit communication connection status 1 indicates OK and 0 indica...

Страница 96: ...ne of the status screens the meter is not communicating with the inverter communication board Check the following l There are no loose connections at the inverter communication board and at the meter l The wiring between the 4 pin terminalblock on the meter and the RS485terminalblock on the Connection Unit is correct refer to An error message is displayed If error code 3x6E or Error 185 Meter Comm...

Страница 97: ...attery communication is disconnected Check the following o The RS485controlconnection to the battery o The communication DIP switches settings on the battery o The ID DIP switches setting on the battery l If the state Idle is displayed instead of Charging Discharging check the following o The system configuration o The DC connection o The LEDs in the Connection Unit refer to ConnectionUnit LEDs on...

Страница 98: ...ge PROCEED WITH CARE A deviation of 1 per string is reasonable Si la tension mesuree est trop haute la tension basse de securite pourrait manquer dans l installation REDOUBLEZ DE PRECAUTION Une deviation de 1 par string est raisonnable Extra power optimizer s connected in the string not applicable to smart modules Check if an extra power optimizer is connected in the string If not proceed to next ...

Страница 99: ...ge is at least 200Vdc check when both inverter ON OFF switch and Connection Unit switch are ON You can check the status screen for the Vdc value l If allLEDs are OFF o Check that AC voltage exists in the inverter o Check that the communication cable between the Connection Unit and the digitalboard is properly connected l If the top LED is ON and middle and bottom LEDs are off an internalfailure ha...

Страница 100: ...es power no power to the backup loads while the inverter is producing power The main circuit breakers or loads circuit breakers in the backed up loads panel have been triggered Check that the backed up loads breakers on the CB panel are in the UP position Internal circuit breaker has been triggered Check that the AC circuit breaker in the Connection Unit is in the UP position see Figure 10 The inv...

Страница 101: ...ition see Figure 10 o Check that the AC bypass switch in the Connection Unit is set to position 1 see Figure 10 Inverter without auto transformer On grid only The inverter does not start production and Error 182 Auto Transformer Temp Too High is displayed The thermal sensor cables are not connected Move the DIP switch SW2 in the Connection Unit to the UP position ON refer to DIP Switch Setup on pa...

Страница 102: ...heating Shutdown non essential loads to reduce the phase imbalance If you use the inverter for on grid applications only without auto transformer move SW2 to the UP position ON refer to DIP Switch Setup on page 38 183 2xB7 Connection Unit Communication Error There is a faulty wire connection or an internal error o Check the communication cable between the Connection Unit and the digital board in t...

Страница 103: ...layed in the initialstatus screen with the format Warning X For example V a c V V d c V P a c W 1 0 0 5 0 0 P _ O K X X X Y Y Y S _ O K W a r n i n g 8 O N The warning is a status screen To view the warning description press the LCD button The following is a list of system warnings Warning LCD text Comments and troubleshooting CPU v3 18xx and before CPU v3 19xx and later 1 4 6 7 8x66 8x69 8x6A 8x6...

Страница 104: ...eci inclus sans être limité à l utilisation de fixations comme des rivets vis clous inserts ou des broches Pour les juridictions ou un marquage de sécurité est requis sur le couvercle du coupeur DC tels que des labels ou étiquettes qui figurent des information du système PV des labels ou étiquettes adhésifs compatibles avec ANSI Z535 peuvent être utilisés qui sont compatibles avec le matériau du c...

Страница 105: ...ed drillguides some of the drillguides may already be open but sealed The drillguides are located at the bottom and sides of the enclosure each with two sizes and 1 Open the required drillguides taking care not to interfere with any of the internalcomponents It is recommended to use a Unibit drill Figure 46 Connection Unit drill guides NOTE Unused conduit openings and glands should be sealed with ...

Страница 106: ... 6 Turn the Bypass switch inside the Connection Unit to position 2 in order to maintain power to the backed up loads 7 Disconnect the meter battery AC and DC wires from the Connection Unit 8 Remove the screws securing the inverter to the mounting bracket and remove the inverter with the Connection Unit from the mounting bracket NOTE If you remove the old inverter and do not immediately install a n...

Страница 107: ...un dysfonctionnement est indiqué sur l écran LCD attendez cinq minutes pour que les condensateurs d entrée de l onduleur soient déchargés 2 Turn OFF the Connection Unit and the AC switch of the distribution panel 3 Open and remove the Connection Unit cover 4 Open and remove the transparent internalcover 5 Remove the battery from the upper board of the Connection Unit and replace with a new standar...

Страница 108: ...ion Unit Open and remove the internaltransparent cover 5 Remove the faulty fuse from the upper board of the Connection Unit and replace with a new fuse 6 Close the Connection Unit cover s Figure 48 Connection Unit fuses Battery Replacement To disconnect or replace a battery 1 Turn OFF the Connection Unit ON OFF switch 2 Turn OFF the inverter ON OFF switch and wait untilthe LCD indicates that the D...

Страница 109: ...meter to verify that DC voltage is below 50V at the battery connection 6 Disconnect the cables from the battery side and replace the battery 7 Connect the battery to the system as described in Connectingtothe Battery on page 34 Appendix C ReplacingandAddingSystemComponents SolarEdge StorEdge Installation Guide MAN 01 00262 1 3 107 ...

Страница 110: ...Appendix D Mechanical Specifications Inverter Dimensions Figure 50 Inverter dimensions SolarEdge StorEdge Installation Guide MAN 01 00262 1 3 108 Appendix D MechanicalSpecifications ...

Страница 111: ...Auto transformer Dimensions Figure 51 Auto transformer dimensions mm in Appendix D MechanicalSpecifications SolarEdge StorEdge Installation Guide MAN 01 00262 1 3 109 ...

Страница 112: ...PUT AC BACKUP POWER 3 Rated AC Power Output 50004 VA Max AC Power Output Surge 66004 VA AC Output Voltage Min Nom Max L L 211 240 264 Vac AC Output Voltage Min Nom Max L N 105 120 132 Vac AC Frequency Min Nom Max 55 60 65 Hz Maximum Continuous Output Current 240V Backup Mode 21 A Max Continuous Output Current per Phase 120V 25 A GFDI 1 A 1These specifications apply to inverters with part numbers S...

Страница 113: ...attery Types LG Chem RESU10H Number of Batteries per Inverter 13 Continuous Power 3300 5000 W Peak Power 5000 7000 W Max Input Current 8 5 17 5 DC Fuses on Plus and Minus 12A field replaceable 25A field replaceable 2 pole Disconnection Yes ADDITIONAL FEATURES Supported Communication Interfaces RS485 for battery RS485 Ethernet ZigBee optional Cellular optional Battery Power Supply Yes 12V 53W 1Thes...

Страница 114: ...t Backup conduit size AWG range 0 75 1 drill guides 14 6 AWG in AWG AC Input Auto transformer conduit size AWG range 0 75 1 14 6 AWG in AWG DC Input PV conduit size AWG range 0 75 14 8 AWG in AWG DC Input Battery conduit size AWG range 0 75 12 10 AWG in AWG Dimensions with Connection Unit HxWxD 37 x 12 5 x 7 2 940 x 315 x 184 in mm Weight with Connection Unit 58 5 26 5 lb kg Cooling Natural convec...

Страница 115: ...Power Up to 25A difference between phases Thermal Protection Yes INSTALLATION SPECIFICATIONS AC Output conduit size AWG range 0 75 14 10 in AWG Dimensions HxWxD 6 7 x 7 9 x 5 5 170 x 200 x 140 in mm Weight 29 7 13 5 lb kg Min Max Operating Temperature 13 to 140 25 to 60 F C Protection Rating NEMA 3R Installation Wall mounted StorEdge Single Phase Inverter withConnectionUnit for HighPower Technical...

Страница 116: ......

Отзывы: