background image

Three Phase Inverter 

with Synergy 

Technology

For Australia

Version 1.1

Quick Installation Guide

PN: SEKxx-AUxxIxxxx

Scan for full 

installation guide

Содержание SEK Series

Страница 1: ...Three Phase Inverter with Synergy Technology For Australia Version 1 1 Quick Installation Guide PN SEKxx AUxxIxxxx Scan for full installation guide...

Страница 2: ...rn the DC Disconnect Switch on off When turning off wait 5 minutes for DC Voltage to drop to safe level before removing the front panel Turn the ON OFF P Switch on off When turning off wait 5 minutes...

Страница 3: ...Notes...

Страница 4: ...SolarEdge Designer to design SE System https designer solaredge com 2 1 MAN 01 00822 1 1 1 Download SolarEdge Mapper to map Array Power Optimisers Download Installing the Power Optimisers 1 1 2 3 4 5...

Страница 5: ...can QR code using Mapper Complete site registration and physical layout in the Monitoring platform Install Power Optimiser M6 Stainless steel 9 5 N m 10 mm 25 mm P860 P960 P1600 12 7 mm 10 mm 25 mm P8...

Страница 6: ...isers 1 1 2 3 4 5 6 Use a dual input Power Optimiser P800p for parallel connection of two PVs or use a branch cable to connect two PVs to a single input Power Optimiser 2 1 series connection Connect i...

Страница 7: ...4 MAN 01 00822 1 1 Connecting the PV Array 2 Check array polarity Verify 1 0 1V per PowerOptimiser Example 8 Power Optimisers 8V 8V...

Страница 8: ...flow 40 cm WARNING Area in front of the inverter must be kept clear for at least one meter 20 cm 30 cm Back to back On metal back sheet On mesh fence Indoor Clearance Outdoor Clearance 20 cm where ann...

Страница 9: ...N 01 00822 1 1 2 1 3 Level provided template horizontally Position provided template vertically 4 Mark holes Mark holes 5 9 mm Drill holes Marking Drilling Holes 4 9 3 cm 16 6 cm 18 7 cm 15 5 cm 9 3 c...

Страница 10: ...MAN 01 00822 1 1 7 Mounting the Units 5 3 2 4 18KG 2 3 1 1 4 N m 4 32KG 4 N m 4 N m 4 N m For left or right units use only the outer screw...

Страница 11: ...grooves in connector with pin guides in socket 2 1 Connect cables according to labels CAUTION Donot block airflow CAUTION Remove plates from unit before drilling holes 1 9 N m Max conduit size 63 mm...

Страница 12: ...2 WARNING DISCONNECT POWER BEFORE BEGINNING INSTALLATION 1 OFF OFF 3 Removing Covers 7 MAN 01 00822 1 1 9 4...

Страница 13: ...th ground of module frames and mounting equipment of the PV array modules is acceptable Combiner Box Important When installing a system with more than 3 strings per a single Synergy Unit whether conne...

Страница 14: ...2 5 N m 35 mm2 70 mm2 8 N m Max 70mm2 Connect PE wire first 10 11 mm Use ferrule when on connecting a fine stranded wire of up to 50mm2 One hole standard barrel compression lugs only 600V CAUTION For...

Страница 15: ...2 COMM 1 5 5 N m 3 A 4 LAN Communication 10 12 MAN 01 00822 1 1 Ethernet 1...

Страница 16: ...1 G A B G A B G A B CAT6 3 wire shielded twisted pair 0 2 1 mm max 1km RS485 Connection of Multiple Inverters 11 5 3 SW1 6 G A B G A B 4 MAN 01 00822 1 1 13 1 Move SW1 switch to ON up to terminate fi...

Страница 17: ...Wi Fi Communication Optional 12 5 5 N m 14 MAN 01 00822 1 1 2 3 4 5 1 Ordered separately...

Страница 18: ...Connecting Cellular Communication Optional 13 MAN 01 00822 1 1 15 2 5 4 5 5 N m 3 1 Ordered separately Ordered separately...

Страница 19: ...A 3 4 1 2 3 4 6 5 3 5 N m Installing Covers 14 16 MAN 01 00822 1 1 2 1...

Страница 20: ...Start Start and follow SetApp Connect power bank 2 Turn ON Power bank 60W output port USB C Power Delivery PD 20V 3A not provided Cover connector when not used 5 7 6 Disconnect and remove power bank...

Страница 21: ...A 1 Download SolarEdge SetApp Download 3 Start Start follow SetApp 2 Commissioning with DC and AC Power Option 2 16 ON ON 18 MAN 01 00822 1 1 Turn switches to ON...

Страница 22: ...1 Protocol SolarEdge Solaredge Leader RS485 1 Follower Detect 4 Commissioning Inverter Units Country Language Site Communication Pairing Status Commissioning the Leader Inverter 17 Country AUS MAN 01...

Страница 23: ...producing Power AC is connected but the system is not producing power Inverter is communicating with the monitoring platform System error A Green Blue Red POWER COMM FAULT LED Indications 18 20 MAN 01...

Страница 24: ...Notes MAN 01 00822 1 1 21...

Страница 25: ...Notes 22 MAN 01 00822 1 1...

Страница 26: ...formation If you have technical problems concerning SolarEdge products please contact us https www solaredge com service support Subject to change without notice Copyright SolarEdge Inc All rights res...