Chapter 7: Commissioning the Installation
This chapter describes how to activate the system, pair the power optimizers to the inverter and verify
the proper functioning of the system.
Removing the Inverter Cover
If the inverter cover is not already removed, use the following procedure for cover removal for
communication connection or maintenance purposes.
1. Turn the inverter ON/OFF switch to OFF. Wait 5 minutes for the capacitors to discharge.
WARNING!
If the inverter was operating properly (power was produced by the power optimizers), the following
message is displayed.
D C V O L T A G E N O T S A F E
D O N O T D I S C O N N E C T
V D C :
7 2 . 0
This message is displayed until the DC voltage is safe (50V). Do not open the cover until the voltage
is safe or until at least five minutes have passed.
La tension de sécurité par défault est de 50V.
Ne pas ouvrir le couvercle ou les connecteurs DC jusqu'à ce que la tension soit affichée comme
sécurisé ou jusqu'à ce que cinq minutes au moins se soient écoulées.
2. Turn the Connection Unit to OFF.
SolarEdge
-
StorEdge Installation Guide MAN-01-00262-1.3
44