
|
13
June 2020
|
Solar Stik® Inc.
24VDC Li Expander Pak 1300 Operator Manual
“Plug & Play” architecture allows rapid expansion or contraction of battery capacity when conditions
warrant.
Use Inter-Connect Strips and Inter-Connect Cables to create an “bank” of Li Expander Paks (Figure 2).
If a Solar Stik System needs to be downsized, due to either reductions in the load or simply to
reallocate energy storage resources to other locations, then Li Expander Paks can be removed from
service in accordance with reductions in runtime requirements.
Figure 2. Connecting Li Expander Paks using Inter-Connect Strips and Inter-Connect Cables
Inter-Connect
Strip 7
Power Hub*
PRO-Verter*
Power Hub*
Inter-Connect
Strip 7
Inter-Connect
Cable
Basic
Expanded
*
Solar Stik power management components have minimum battery capacity requirements for
operation at their rated capacities. Consult the individual component manuals for their minimum
capacity requirements.
Li Expander
Pak 1300
Li Expander
Pak 1300
Scaling Methods