8.0.
Making Line Connections
Line connections are easily accomplished using the
supplied brass compression connectors.
When using compression connectors, be sure a small
amount of tubing material is showing on the outside of
the ring and that you use a small amount of sealing
material on the joining surfaces before tightening.
Preparing the Collector
The following connection are usually made behind the
collector so they are hidden as much as possible unlike
the diagrams which show the parts off the end of the
collector for illustrative purposes.
If you have not already done so, pull the aluminum
tabbed tape off the top and bottom absorber connection
and pull the absorber ends union out. The absorber fins
should line up side beside in the collector
.
Collector Connections:
Air Vent
Pressure Relief Valve
90
o
Compression Union
Absorber Hot Outlet
Sensor goes 4 to 6 inches inside
the Hot Out absorber hole
which will be sealed with
insulation.
90
o
Compression Union
Roof Boot Flashing
Collector
Absorber Feed Inlet
90
o
Compression Union
Roof Boot Flashing
OPTIONAL PV PANEL INSTALLATION
PV PANEL
Roof Mounting Brackets
Содержание Fireball 20014
Страница 2: ......