Solar Bollard Lighting SBL SERIES Скачать руководство пользователя страница 2

© 2003 - 2016 Key Wholesalers Pty Ltd t/a Solar Bollard Lighting- All rights reserved 

SBL SERIES MOUNTING TYPE INSTALLATION INSTRUCTIONS 

BURIED IN GROUND POLE 

-

  

BEFORE YOU INSTALL: 

Dial before you Dig

 

Ensure Anchor Bolts are through pole base/s. 

STEP 2A - 

Dig hole to depth for pole length being 

used as per below instructions: 

 

Note:

 

A  larger  concrete  foundation  maybe  required  for  very 

poor (sandy) soil

  

Pole Length 

Hole 

Depth 

Insert 

Pole 

Hole 

Diameter 

1140mm 45’ 

400mm 16’  300mm 12’  300mm 12’ 

2840mm 112’ 

600mm 25’  500mm 20’  300mm 12’ 

3640mm 143’ 

900mm 36’  800mm 31’  300mm 12’ 

STEP 2B - 

Pour concrete into the hole 

STEP 2C - 

I

nsert pole into concrete ensuring the 

internal of the pole is also filled with concrete. Use 
spirit level to ensure pole is set correctly.

 

 

STEP 2D - 

Cure concrete before re-attaching the 

SBL Series light head. Cover the pole top with plastic 
or similar. 

RETURN TO PREVIOUS PAGE STEP 3:

 

Light Head Re-Attachment Instructions 

-

 GROUND MOUNT POLE 

-

  

BEFORE YOU INSTALL: 

(not included in kit) 

 

Mounting Bolts, M12 (1/

2’) Washer, 4 x M12 (1/2’) Nuts.             

We recommend using security fasteners to prevent theft.

 

STEP 2A 

Check with spirit level mounting surface 

is flat as pole must sit level for solar recharging.  

STEP 2B 

Mark out holes on mounting surface to 

suit base plate. 

 

STEP 2C

 - 

Drill or core hole to take an M12 (

1/2’) 

thread or other securing device 

STEP  2D

  - 

Install  your  mounting  threads.

 

ENSURE 

MINIMUM

 

of 

30mm (1.2’) of actual thread is protruding 

above surface. Base plate thickness is 12mm (0.5

’). 

STEP  2E 

Place  the  base  plate  over  the  bolts  and 

secure  pole  with  your  locking  nuts.  Use  spirit  level 
while tensioning to ensure pole is set level.  

RETURN TO PREVIOUS PAGE STEP 3:

 

Light Head Re-Attachment Instructions 

WALL MOUNT INSTALLATION 

-

 

BEFORE YOU INSTALL: 

(not included in kit) 

 

Mounting Bolts, M12 (1/2’) Washer, 4 x M12 (1/2’) Nuts.              
We recommend using security fasteners to prevent theft.

 

 

Note: Lower power models can achieve the lower mounting 
position without full directional sun all day.

 

STEP 2A 

Mark holes on surface to suit wall plate. 

 

STEP  2B 

Drill  or  core  hole  to  take  an  M12  (1/2’) 

securing  device  then  install  your  mounting  threads. 
ENSURE MINIMUM of 30mm (1.2’) of actual thread is 
protruding above concrete. Wall plate thickness 10mm 
(0.4’) 

STEP 2C 

Place plate over the bolts and secure plate 

with your locking nuts.

 

RETURN TO PREVIOUS PAGE STEP 3:

 

Light Head Re-Attachment Instructions

 

All dimensions in millimetres  

All dimensions in millimetres 

Отзывы: