O
P
Then trim the ends of the cable ties with a side cutter.
Now install the battery
Connect the plug to the socket, slide the battery into the
cut-out and secure with 2 cable ties.
Exactly here: cable tie end
Set this switch
to "ON"
Colour selection
Set this switch
to "SUMMER"
Set the
potentiometer
to approx.
"5 o'clock"
TEST RUN:
You have now soldered everything that was necessary and
are now ready for the first test run. Set the SW2 switch to
"ON" and the SW1 switch to "SUMMER" and turn the
potentiometer to approx. "5 o'clock". Then you only need to
make sure the solar cell is not receiving any daylight. After
all, the solar cell also serves as a photoelectric switch.
Meaning the lamp only comes on when it's dark.
Cover the solar cell or go into a dark room to test the lamp.
Use the SW3 switch to change between
white and multi-colour LED.
1
2
3
4
5
6
7
8
9
10
11
12
Содержание 79334
Страница 12: ...3 Image A 1 Insert short leg here Insert long leg here 2 4 Result ...
Страница 21: ...Now slide the finished PCB into the cap adapter Ensure the PCB is upright in the cap adapter E F ...
Страница 26: ...WIRING DIAGRAM ...
Страница 27: ......