FG-200 HSE/FF Modbus
Quick Startup Guide
Version: EN-102018-1.31
© Softing Industrial Automation GmbH
Страница 1: ...FG 200 HSE FF Modbus Quick Startup Guide Version EN 102018 1 31 Softing Industrial Automation GmbH...
Страница 2: ...Sec 443 German Civil Code We reserve the right to make any alterations or improvements to these instructions without prior notice The actual design of products may deviate from the information contain...
Страница 3: ...Scope of delivery 9 2 3 System requirements 9 2 4 Safety precautions Chapter 3 11 Installation 11 3 1 Hardware installation 11 Mounting and dismounting 3 1 1 13 Connection diagram 3 1 2 14 Connecting...
Страница 4: ...icators LEDs 27 5 1 PWR power supply 27 5 2 Device LED statuses in stand alone mode 28 5 3 RUN ERR RDL LED statuses in redundant mode 32 5 4 H1 channel status indicators Chapter 6 33 Technical data 33...
Страница 5: ...This page is intentionally left blank Softing Industrial Automation GmbH 5...
Страница 6: ...must have read and fully understood the safety requirements and working instructions in this guide 1 3 Typographic conventions The following conventions are used throughout Softing customer documenta...
Страница 7: ...f this device 1 4 Document feedback We would like to encourage you to provide feedback and comments to help us improve the documentation If you have a PDF copy of this document simply write your comme...
Страница 8: ...nd Fieldbus power supplies Series 9412 2 1 Intended use The FG 200 can be used for integrating up to four FF H1 links into a Modbus control system TCP or RTU or for communication between FF H1 devices...
Страница 9: ...et Explorer version 8 0 or higher Mozilla Firefox version version 35 or higher 2 4 Safety precautions Use in hazardous areas The FG 200 is an electrical equipment with degree of protection Ex nA appro...
Страница 10: ...een operated under non intrinsically safe conditions is no longer permitted to be used under intrinsically safe conditions The FG 200 HSE FF Modbus is only approved for intended and appropriate use In...
Страница 11: ...ing high temperatures of at least 90 C 3 1 1 Mounting and dismounting Note Make sure the FG 200 is mounted in a manner that the power supply disconnecting device or interrupt facility can always be re...
Страница 12: ...ress the FG 200 down towards the rail until it slides into place over the lip of the locking bar Note Do not put stress on the device by bending or torsion Dismounting 1 Slide a screwdriver diagonally...
Страница 13: ...Chapter 3 Installation Softing Industrial Automation GmbH 13 3 1 2 Connection diagram The following connection diagram shows the physical interfaces of the FG 200...
Страница 14: ...oltage 18 VDC 32 VDC is connected by a 3 pole terminal block The power supply is connected to the plug connector via flexible wires with a cross section of 0 75 to 1 5 mm The ground connection wire mu...
Страница 15: ...one of the two Ethernet ports ETH1 or ETH2 2 Connect each link of your FOUNDATION fieldbus H1 network via a power conditioner to a Fieldbus Channel port of your gateway CH0 to CH3 Note When using the...
Страница 16: ...Industrial Automation GmbH FG 200 with Modbus connection Note Your FG 200 cannot operate in both Modbus TCP and Modbus RTU mode at the same time Note When you connect your FG 200 to a Modbus RTU Mast...
Страница 17: ...with two FG 200 in redundant mode the serial connection cannot be used see next Section 3 1 6 FG 200 redundancy If you intend to use two FG 200s as a redundant set connect the redundancy link interfa...
Страница 18: ...s must be cross linked Do not power up devices when serial link is missing If the two FG 200 s forming a redundant set are powered while the serial link is missing both devices will behave like indepe...
Страница 19: ...supply Before you remove the power supply from the primary device make sure the secondary device is operational In a redundant set of FG 200s removing the power supply the Ethernet cable or the redund...
Страница 20: ...ired for each H1 link When using a redundant set of two devices make sure to connect each H1 link to the same channel CH 1 CH 4 on both FG 200s The FG 200 provides four Foundation Fieldbus H1 interfac...
Страница 21: ...15 Fieldbus FF H1 bus line channel 4 CH4 Pin Signal Description 16 Fieldbus 17 S Fieldbus shield 18 Fieldbus Note The fieldbus shield is not connected directly to functional earth For EMC reasons it i...
Страница 22: ...ect the H1 links to the terminal blocks of the H1 interfaces Make sure to connect each H1 link to the same channel CH 1 CH 4 on both FG 200s 3 Connect the second FG 200 to the Ethernet switch or hub 4...
Страница 23: ...ed open an Explorer window select your CD drive and double click the file start exe in the CD s root directory 2 Select Installation of FG 200 Software and Documentation in the startup page 3 Select t...
Страница 24: ...ecting the FG 200 to your LAN network make sure that its IP address is not used by another network station To assign a new IP address to your PC you must have administrator rights 1 Open a browser e g...
Страница 25: ...Conf project For information on how to set up a project in the Communication Configuration Tool and working with the FG 200 web server interface refer to the User Guide on CD or download the lastest d...
Страница 26: ...upply RUN stands for running ERR stands for error RDL stands for redundancy link CH1 to CH4 stands for H1 channel 1 to H1 channel 4 The LEDs may be on permanently or flash in different colors and freq...
Страница 27: ...g table shows possible LED combinations in stand alone mode LEDs Meaning PWR RUN green ERR RDL Startup phase approximately 7 seconds During this phase redundancy role is determined PWR RUN green green...
Страница 28: ...d by redundancy link packets red link communication interrupted or aborted broken down off no link communication at all LEDs Meaning PWR RUN green ERR RDL Start up phase approx 7 seconds During this p...
Страница 29: ...non redundant device failure The device is acting as non redundant device but a failure has been detected or Secondary device not ready The device is acting as secondary device in a redundant set but...
Страница 30: ...information has been successfully transferred from the Primary Device and the redundancy link is operational PWR RUN green red ERR RDL Secondary device hardware failure The device is acting as second...
Страница 31: ...Chapter 5 Status indicators LEDs Softing Industrial Automation GmbH 31 LEDs Meaning PWR RUN green red ERR RDL Primary configuration error...
Страница 32: ...ors The following table shows the channel LEDs and their meaning of all four channels CH1 CH4 Symbol Color frequency Meaning green Visitor address flashing slowly 0 5 Hz not in LAS role flashing quick...
Страница 33: ...supported Do not use ETH 2 reserved for further use Minimum ambient operating temperature 40 C Storage temperature 40 C 85 C Relative humidity 10 95 non condensing Altitude Must not exceed 2 000 m Loc...
Страница 34: ...istance Provide a minimum distance of 50 mm to the air inlet and air outlet to ensure natural convection Rotated installation position The maximum permissible ambient temperature values also apply to...
Страница 35: ...mation GmbH 35 Vertical installation position Maximum number of fieldbus channels Maximum fieldbus voltage Minimum distance Maximum permissible ambient temperature Ta 4 32 VDC 0 mm 40 C 2 24 VDC 0 mm...
Страница 36: ...CEx marking for explosion protection Ex nA ic IIC T4 Gc ATEX marking for explosion protection II 3G nA ic IIC T4 Gc The Ex protection method ic corresponds only to the FF H1 fieldbus interfaces The FG...
Страница 37: ...and D hazardous or non hazardous locations The device must be installed in a protective enclosure which meets the requirements for resistance to impact and IP54 according to IEC 60529 Marking for expl...
Страница 38: ...standard emission for industrial environments EN 61000 6 2 Electromagnetic compatibility EMC Part 6 2 generic standard immunity for industrial environments Note To fulfill the EMC requirements the oth...
Страница 39: ...equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications VCCI Thi...
Страница 40: ...Softing Industrial Automation GmbH Richard Reitzner Allee 6 85540 Haar Germany http industrial softing com 49 89 45 656 340 49 89 45 656 488 info idn softing com...