Inspection Procedures Codes
(1) Weld cracks, dents and/or rust
(2) Installation
(3) Leaks
(4) Operation
(5) Condition
(6) Tightness
(7) Residue buildup
(8) See placards and decals inspection chart
Check
OK
✔
X
Chassis
Structural (1)
Tires (5)
Tire pressure (5)
Hydraulic tubes and hoses (3,5)
Decals and placards (2,8)
Wheel nuts (6) Torque 50 lbft 68NM
Battery disconnect switch (4)
Lubrication points
Pins, pin keepers (2)
Turntable
Structural (1)
Swivel mount assembly (2,3)
Hydraulic tubes and hoses (3,5)
Cowling (5,6)
Wire harness (2,5)
System pressure (Max 2500 psi)
Lubrication points
Emergency bleed down valve (4,3)
Engine (2,4)
Engine charging system (4)
Engine air filter (5)
Engine oil level (5)
Hydraulic pump (4)
Engine oil (5)
Electric choke (4)
Hydraulic oil reservoir (2,3,5)
Hydraulic oil reservoir filler/breather cap (2,6)
Hydraulic oil reservoir fluid level (5)
Hydraulic oil return filter (3,4)
Pins, pin keepers (2)
Lower Booms
Structural (1)
Boom lift cylinder pin caps (2,6)
Boom lift cylinder and holding valve (3,4)
Jib cylinder pin (3,4)
Hydraulic tubes and hoses (3,5)
Electrical Wires (5,2)
Upper Booms
Structural (1)
Electrical wires (5)
Jib cylinder pin caps (2,6)
Jib cylinder and holding valve (3,4)
Hydraulic hoses and tubes (3,5)
Check
OK
✔
X
Decals and placards (2,8)
Platform rotator (Optional) (3,4)
Platform rotation holding valve (3,4)
Rotator mounting bolts (2,6)
Platform
Structural (1)
Decals and placards (2,8)
Platform gate (4)
Hydraulic tubes and hoses (3,5)
Platform mounting bolts (2,6)
Correct operator's manual in document holder (2)
Battery
Battery terminals (6,7)
Battery electrolyte level (5)
Fuel Tank
Fuel tank (3,5)
Fuel tank cap (2,3,4,5)
Ground Control Station
Station selector switch - ground controls
platform controls DO NOT work (4)
Station selector switch - platform controls
ground controls DO NOT work (4)
Cold start (4) Choke
Keyed master switch (4)
Boom speed rheostat switch (4)
Turntable rotation (4)
Upper boom lift UP - DOWN (4)
Lower boom lift UP - DOWN (4)
Jib boom lift UP - DOWN (4)
Emergency stop (4)
Platform Control Station
Foot switch (4)
Foot switch, functions operate when engaged (4)
Start switch (4)
Cold start (4) Choke
Boom speed rheostat switch (4)
Turntable rotation (4)
Upper boom lift UP - DOWN (4)
Lower boom lift UP - DOWN (4)
Jib boom lift UP - DOWN (4)
Emergency stop (4)
Optional Equipment
Air line to platform (2,4)
Dual fuel system (2,4)
Platform work lights (2,4)
Platform rotation (4)
page xvi
Rev D
MHP13/35 & MHP15/44 Mark II – 12785B
Maintenance Information
■
Preventive inspection maintenance
90 day or 150 hour checklist
OK
OK - No Service Required
Serial Number
✔
Corrective Action Required
X
Corrected, (Record description of corrective action).
Содержание MHP 13/35 Mark II
Страница 6: ......
Страница 14: ......
Страница 31: ...page 1 2 Rev D MHP13 35 MHP15 44 Mark II 12785B...
Страница 38: ......
Страница 48: ......
Страница 63: ......
Страница 65: ...page 2 2 Rev D MHP13 35 MHP15 44 Mark II 12785B...
Страница 79: ......
Страница 85: ......
Страница 117: ......