background image

SET-UP INSTRUCTIONS & PRE-OPERATION CHECKLIST for  

SNAPPER INTERMEDIATE FRAME SNOW THROWERS 

 
INTRODUCTION: The SNAPPER Intermediate Frame Snow Throwers are shipped almost fully assembled and 
require minimal set-up. Setting up the machine will require the handles to be unfolded and secured, and the 
attachment of the chute crank rod. Some models may also require the installation of an electric start kit to the 
engine. Complete each of the following steps carefully. Review and complete each item as instructed on the 
Pre-Operation checklist. The Snapper Product Registration card must be filled out and sent to Customer 
Service department at Snapper when completed. 
 
STEP 1:  HANDLES: 
Cut both wire ties that secure the 
control cables to the handles. Be very careful and DO 
NOT
 cut the control cables. See Figure 1. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

FIGURE 1 

 
STEP 2:  HANDLES:  
Loosen handle nuts and rotate 
handles up to the operating position. Remove shipping 
cardboard from in between handles. See Figure 1. 
Insert bolts through both upper & lower handles and 
secure with nuts. Make sure the square necks of the 
bolts are recessed into the square holes of upper 
handles. Tighten nuts securely. See Figure 2. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

FIGURE 2 

STEP 3:  HANDLES: Cut both wire ties that secure the 
control levers to the handles. Cut the wire tie that 
secures the chute crank to the handle. See Figure 3. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

FIGURE 3 

 
STEP 4:  CABLES:  
Make sure that the “Z” bend ends 
of control cables are secured in the holes on the control 
levers. Make sure cables are not kinked and have 
freedom of movement when levers are engaged or 
disengaged. See Figure 4. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

FIGURE 4 

 
 
 
 

INSTRUCTIONS No. 7-4331 (Rev. 1, 4/08/02)

 

 

SECURE UPPER 
HANDLES WITH 
BOLTS AND NUTS 
TIGHTEN SECURELY 

CUT WIRE TIE 
THAT SECURES 
CHUTE CRANK 

CUT WIRE TIES 
THAT SECURE THE 
CONTROL LEVERS 
TO THE HANDLES 

CHUTE 
CRANK 

 

CHECK “Z” BEND END OF CABLE 
IS SECURELY INSERTED INTO 
HOLE ON CONTROL LEVER 

CONTROL 
LEVER 

CONTROL 
LEVER 

CONTROL 
LEVER 

 

CUT CABLE TIES 
ON BOTH 
HANDLES 
 
DO NOT CUT 
CONTROL CABLE 

LOOSEN NUT 
REMOVE 
CARDBOARD 

Содержание Intermediate Frame Snow Throwers

Страница 1: ...ting position Remove shipping cardboard from in between handles See Figure 1 Insert bolts through both upper lower handles and secure with nuts Make sure the square necks of the bolts are recessed into the square holes of upper handles Tighten nuts securely See Figure 2 FIGURE 2 STEP 3 HANDLES Cut both wire ties that secure the control levers to the handles Cut the wire tie that secures the chute ...

Страница 2: ...olt washer and wing nut Tighten securely Use wing nut to securely lock deflector into desired position See Figure 7 FIGURE 7 NOTE After set up the hardware bag will contain two shear bolts and two nuts and a cotter pin IMPORTANT All necessary initial adjustments are made to the machine at the factory The following cable adjustments and lubrication are provided for reference only Complete all items...

Страница 3: ...rom check plug hole pump BENELENE 900 grease SNAPPER Part No 2 9577 into fill plug on case until grease is visible Reinstall check plug See Figure 9 FIGURE 9 STEP 10 CHECKLIST Complete all items on the Pre Operation Checklist as instructed SPRING SHOULD STRETCH 3 8 WHEN HANDLE IS DEPRESSED CONNECTOR TO ADJUST LOOSEN JAM NUT AND TURN CONNECTOR TO SHORTEN OR LENGTHEN CABLE AS NEEDED TO ATTAIN THE 3 ...

Страница 4: ...position _____ ENGINE ELECTRIC STARTER checked for proper operation _____ FUEL SYSTEM checked for leaks around tank and connections ______DISCHARGE CHUTE CRANK checked for proper operation and free rotation ______AUGER and WHEEL DRIVE CONTROL CABLES checked and adjusted per instructions in the Operator s Manual _____ GROUND SPEED CONTROL checked and adjusted per instructions in the Operator s Manu...

Отзывы: