![Smith PWC Dolly Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/smith/pwc-dolly/pwc-dolly_assembly-instructions_1305361002.webp)
8. Assemble (2) 4 ft. carpeted bunks with brackets (27575-7) on
y-bunk brackets (28106z) at desired angle using (4) 3/8”-16 x 1” hex head
bolts (11041) and (4) 3/8”-16 nylon locknuts (10810).
9. Tighten all hardware at this time.
Note: Be careful not to overtighten.
10. Assemble doubler (27575-5) to inside of bottom end
tube (27575-1).
Note: Doubler hole position.
11. Assemble caster (2-40SB1) stud through bottom of tube and through
doubler. Attach 1/2”-13 whiz locknut (10822). Repeat Step 10 and 11 for
other three casters.
12. Assemble (8) black plastic insert caps (11332).
PARTS INCLUDED
2 - 27575-1
Bottom end tube
2 - 27575-2
Upright tube
2 - 27575-3
Support tube
2 -
27575-7
Carpeted bunk w/brkt
4 - 2-40SB1
Caster
8 - 27575-4
Corner brace
4 - 27575-5
Doubler, caster
4 - 28106Z
Y-bunk bracket
4 - 11041
3/8”-16 x 1” Hex Hd Bolt
8 - 11022
3/8”-16 x 2-1/4” Hex Hd Bolt
8 - 10919
3/8”-16 x 3-3/4” Hex Hd Bolt
16 - 10810
3/8”-16 Nylon Locknut
4 - 10820
3/8”-16 Whiz Locknut
4 - 10822
1/2”-13 Whiz Locknut
8 - 11332
Black plastic cap
TOOLS REQUIRED
2 -
9/16” Wrenches
1 -
3/4” Box End Wrench
Doubler
Corner
Brace
P/N 27575-5
P/N 27575-4
Form 27575
/N 00513
P
Revised March 2006