background image

23

24

smithandnoble.com

800.248.8888 

DIRECT MOUNT - GETTING STARTED

Tools & Parts

First, make sure you have all the parts and tools required to install your shutters. 

HARDWARE YOU’LL NEED: 
Pencil, ¼" nut driver, level, and a drill with a 

1

16

" drill bit.

RECOMMENDED TOOLS:
Drill (Cordless), Tape Measure, Box knife, #2 Phillips drill tip, #6 Countersink drill bit (for 

light block) if nails will not be used.

Make sure “Item #” box label matches if multiple panels will be used. This application WILL 

NOT have frame boxes to match with the “Item #” however, in a multiple panel situation, 

you may have multiple boxes.

•  Do not dispose of packaging until the shutters are operating appropriately.

•  Use of a moving blanket or drop cloth is recommended.

•  Find ample working space to assemble your frame (preferably in front of the window).

•  Check the diagram to make sure you have all the parts indicated for the appropriate type 

of installation.

    

HINGE SCREW

LIGHT BLOCK SCREW

HINGE PIN

LOOSE-LEAF HINGE

HINGE SPACER

DIRECT MOUNT - INSTALLING HINGES

Completely install the 

hinge pin. 

Slide panel to left 

window jam. 

Note mark on wall/

jam. 

Panel in the window 

opening.

Mark should be made 

on the wall/jam at the 

bottom of the hinge.

Installing the Left Hinge

Carefully  remove  panels  and  light  blocks 
from the packaging. Do not mix panels for 
other windows.

All  light  blocks  will  be  labeled:  Top, 
Bottom, Left, and Right.

Before placing the left panel into the 
window opening, locate ALL loose-
leaf  hinges  and  attach  each  to  its 
panel hinge with hinge pins provided.

NOTE: The hinge is a 2-part hinge 
held together by the hinge pin.

Once the loose-leaf hinge is secured 
onto  the  panel  hinge,  place  the  left 
panel in the opening and slide to the 
left  window  jam.  Once  aligned  with 
the left window jam, space the height 
gap evenly in the window opening.

Tip: To distribute the height gap evenly on the top 
and bottom, a shim is recommended.

Tip: The shim that is marked with a pencil, can be 
used as a guide for the right panel height spacing.

After  you  have  evened  the  height 
gap, make a small mark where the top 
hinge will be installed on the window 
jam at the bottom of the hinge.

}

Hinge

Содержание Eco-Wood Shutters

Страница 1: ...Deco Frame L Frame Z Frame Direct Mount and Hang Strips Eco Wood Shutters STEP BY STEP INSTALLATION INSTRUCTIONS...

Страница 2: ...nday Friday 6am 6pm PT Saturday Sunday 7am 4pm PT smithandnoble com Everything You Need TABLE OF CONTENTS Deco Frame Getting Started 3 Assemble Frames 4 Installing T Posts Frames 5 Installing Panels 6...

Страница 3: ...rt screwdriver into slot under filler strip CAREFULLY lift up on the screwdriver to separate frame from filler strip Slide finger along frame to safely release the filler strip Completely remove the f...

Страница 4: ...The top and bottom of the t post are labeled locate and identify Line up the pre drilled holes with the top frame and secure with screws provided Repeat for bottom frame Tip It is recommended to use...

Страница 5: ...Set Hoffman Key round side up and push top frame down onto the Hoffman Key Repeat this step for remaining corners before completing the frame assembly TIP The Hoffman Key has a rounded and a flat sid...

Страница 6: ...t to angle the drill gun or nail gun to ensure contact with a stud around the window opening Leveling the Frame Once the left side is secured level the frame on the window and secure with nail screw p...

Страница 7: ...RS SCREWS SCREWS NAIL GUN NAIL GUN ENSURING THE REVEAL IS EVEN MAKE A SMALL MARK ALONG YOUR FRAME FOR REFERENCE ONLY SECURE ONE NAIL INTO THE BOTTOM LEFT FRAME ONLY SECURE ONE NAIL INTO THE BOTTOM LEF...

Страница 8: ...ace to assemble your frame preferably in front of the window Check the diagram to make sure you have all the parts indicated for an appropriate installation A A 4 SIDED Z FRAME ASSEMBLE FRAMES Assembl...

Страница 9: ...d All Z Frame T Post installations are exactly alike Installing the Frame If SCREWS will be used PRE DRILL in the top left and right frame bottom left and right frame and in the middle of the top and...

Страница 10: ...dow opening secure with a nail screw pre drill into the upper left frame ONLY Shutter will be fully secured in later steps USING SCREWS only secure 1 one screw into the top LEFT frame USING NAIL GUN o...

Страница 11: ...e even across the top and bottom If panels are not even shift rack your frame left to right until your reveal is even Double check and make sure panels are still even across the top Installing the Bot...

Страница 12: ...TOM frames USING NAIL GUN only secure 1 one nail into the TOP BOTTOM frames TIP Move top bottom frame up and down to achieve proper tolerance between panel and frame TIP Move side frames in and out to...

Страница 13: ...HINGE SPACER DIRECT MOUNT INSTALLING HINGES Completely install the hinge pin Slide panel to left window jam Note mark on wall jam Panel in the window opening Mark should be made on the wall jam at the...

Страница 14: ...e is properly positioned install screws into the center of the top and bottom slotted hinge holes and secure top hinge NOTE Center set screw will be installed in later steps Tip Pre drilling is recomm...

Страница 15: ...d in later steps Installing the Right Panels Tip Pre drilling is recommended forpropersetting of screws 6 countersink drill bit works best Place the right shutter panel into the opening and slide into...

Страница 16: ...cers Now that your panels and hinges are installed close panels check gaps between panels and around the window opening and adjust accordingly Use Hinge Spacer if side to side adjustment is needed Use...

Страница 17: ...your frame preferably in front of the window Check the diagram to make sure you have all the parts indicated for the appropriate type of installation HINGE SCREW LIGHT BLOCK SCREW HINGE PIN FRAME SCR...

Страница 18: ...hang strip properly positioned in the opening insert screw in top pre drilled holes and secure left frame to the jam Make sure the hinge barrel is position correctly before securing screw REPEAT for...

Страница 19: ...sert hinge pins into all hinges to secure the panel Check gaps between panels and around the window opening adjust accordingly Ideally panels should rest lightly on the sill whenever possible Adjustme...

Страница 20: ...ght and left of the frames NOTE Inserts MUST be installed prior to installing the top and bottom light blocks Installing Light Blocks After securing your inserts position the bottom light block flush...

Страница 21: ...to your receipt and covers defects in material or craftsmanship Shades or blinds must have been properly installed We reserve the right to determine if your window covering warrants a repair or a rep...

Отзывы: