‐
CW
420/430
25
Wait
for
P1
to
appear
and
LED
L1
to
change
from
red
to
green;
the
tank
heating
element
light
comes
on
until
the
set
temperature
is
reached.
The
duration
of
this
stage
may
vary
depending
on
the
mains
water
temperature
and
on
the
single
‐
phase
connection.
Press
the
button
quickly
to
display
the
tank
(left)
and
boiler
(right)
temperatures
for
a
short
time.
Load
the
dishes
Select
the
program
required
by
pressing
.
Confirm
the
program
start
by
pressing
and
holding
it
down
for
1
second
(light
L2
changes
from
green
to
orange).
Cycle
in
progress,
the
progress
of
the
cycle
is
displayed
by
vertical
bars
which
illuminate
in
sequence.
If
the
door
is
opened
“CLOSE”
flashes
and
the
program
stops;
when
it
is
closed
again
the
program
restarts
from
the
beginning
.
At
the
end
of
the
program
“
End
”
flashes
Unload
the
dishes
When
the
door
is
closed
again,
the
system
offers
the
last
program
run.
Содержание CWG420
Страница 1: ...PROFESSIONAL DISHWASHER ...
Страница 11: ... CW 420 430 11 Figure 1 Appliance electrical system diagram ...