![Smeg CVB20LNE Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/smeg/cvb20lne/cvb20lne_manual_1302482007.webp)
Instructions for the Installer
27
Attention:
Force should not be used in adjusting the seals. Do not tear or detach the seal from the door.
A few days after installation, check that the initial level adjustment is still correct. Make sure that the
freezer is still stable and the door seals still close hermetically when it is in operation and loaded with
food. If necessary, re-adjust the level and the door seals as shown below.
Fig. 3
Fig. 4
3.3 Electrical connection
Leave the freezer in a vertical position for at least two hours before turning it on for the first time.
Connect the supply cable of the appliance to an earthed electrical socket, installed in accordance with
electrical safety standards. The nominal voltage and frequency are indicated on the nameplate inside
the freezer. The appliance must be connected to the power grid and earthed in accordance with the
applicable standards and requirements. The appliance can withstand brief voltage changes of no less
than 15% and no more than 10% of the nominal voltage stated on the nameplate. If the supply cable
needs to be changed, this procedure must only be carried out by an
authorised technician from
Smeg's technical support service.
The plug must be accessible when the appliance is installed.