I
NSTALLING
THE
S
WITCH
3-4
Mounting
A TigerSwitch 10/100 unit can be mounted in a standard 13-inch
equipment rack or on a desktop or shelf. Mounting instructions for each
type of site follow.
Installing Optional Modules
: Before mounting the switch, be sure you
install any optional modules. If you have purchased optional slide-in
1000BASE-T, 100BASE-FX or GBIC media expansion module, install
these modules now, following the instructions in “Installing an Optional
Module into the Switch” on page 3-7.
Rack Mounting
Before rack mounting the switch, pay particular attention to the following
factors:
◆
Temperature:
Since the temperature within a rack assembly may be
higher than the ambient room temperature, check that the
rack-environment temperature is within the specified operating
temperature range. (See page C-2.)
◆
Mechanical Loading:
Do not place any equipment on top of a
rack-mounted unit
◆
Circuit Overloading:
Be sure that the supply circuit to the rack
assembly is not overloaded.
◆
Grounding:
Rack-mounted equipment should be properly grounded.
Particular attention should be given to supply connections other than
direct connections to the mains.
Содержание TigerSwitch 10
Страница 2: ......
Страница 20: ...FIGURES xvi...
Страница 30: ...ABOUT THE TIGERSWITCH 10 100 1 10...
Страница 56: ...MAKING NETWORK CONNECTIONS 4 10...
Страница 74: ...ORDERING INFORMATION D 2...
Страница 80: ...Glossary 6...
Страница 84: ...INDEX Index 4...
Страница 85: ......