
9/12
FGX-OMZ0008
5.
Installation and Piping
【
1
】
Installation
1) When installing, allow sufficient space for maintenance.
Reserve a space of 100mm or more beneath the reservoir.
2) Start with a flow with an initial differential pressure across the element of 0.02 MPa or less.
If operation starts with differential pressure exceeding 0.02 MPa, the element replacement will be shortened significantly.
3) This filter generates particles at first. Before initial operation, flush the piping enough to remove the particles completely.
【
2
】
Piping
1) Check each port size for selecting valves and fittings suitable for operating conditions.
Please check Safety Instruction before use.
2) For filter piping, apply a spanner to the filter cover so that force is not applied to the filter case.
6.
Maintenance
Make sure periodically that there is no leakage from around the seals.
Periodically check the pressure, temperature, surge pressure, etc. to make sure they are within the specified range of the filter.
Replace the element before the differential pressure across it reaches 0.1 MPa due to clogging.
* Element is a disposable product. It cannot be cleaned.