![SMC Networks 8748L2 - annexe 1 Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/smc-networks/8748l2-annexe-1/8748l2-annexe-1_installation-manual_1300720051.webp)
T
WISTED
-P
AIR
D
EVICES
4-3
Network Wiring Connections
Today, the punch-down block is an integral part of many of the newer
equipment racks. It is actually part of the patch panel. Instructions for
making connections in the wiring closet with this type of equipment
follows.
1. Attach one end of a patch cable to an available port on the switch, and
the other end to the patch panel.
2. If not already in place, attach one end of a cable segment to the back
of the patch panel where the punch-down block is located, and the
other end to a modular wall outlet.
3. Label the cables to simplify future troubleshooting. See “Cable
Labeling and Connection Records” on page 4-9.
Figure 4-2 Network Wiring Connections
Содержание 8748L2 - annexe 1
Страница 2: ......
Страница 14: ...COMPLIANCES x ...
Страница 20: ...FIGURES xvi ...
Страница 30: ...ABOUT THE TIGERSWITCH 1 10 ...
Страница 38: ...NETWORK PLANNING 2 8 ...
Страница 58: ...MAKING NETWORK CONNECTIONS 4 10 ...
Страница 62: ...TROUBLESHOOTING A 4 ...
Страница 76: ...GERMAN INSTRUCTIONS D 4 ...
Страница 82: ...Glossary 6 ...
Страница 86: ...INDEX Index 4 ...
Страница 87: ......