![SMC Networks 6709FL2 INT - annexe 1 Скачать руководство пользователя страница 28](http://html.mh-extra.com/html/smc-networks/6709fl2-int-annexe-1/6709fl2-int-annexe-1_installation-manual_1300169028.webp)
I
NSTALLING
THE
S
WITCH
3-2
Equipment Checklist
After unpacking the TigerSwitch 10/100, check the contents to be sure
you have received all the components. Then, before beginning the
installation, be sure you have all other necessary installation equipment.
Package Contents
◆
1 SMC6709FL2 TigerSwitch 10/100 unit
◆
Four adhesive foot pads
◆
3 types of AC power cord. Please choose appropriate cable for your
region.
◆
RS-232 console cable
◆
This Installation Guide
◆
Management Guide
◆
One set of rack mount kit
◆
SMC Warranty Registration Card—be sure to complete and return to
SMC
Note:
The package equipment contents include three types of power
cord. The power cords are for the EU, UK and US. Please ensure
that you choose the power cord that corresponds to your region.
Содержание 6709FL2 INT - annexe 1
Страница 2: ......
Страница 20: ...ABOUT THE TIGERSWITCH 10 100 1 8 ...
Страница 42: ...CABLES B 6 ...
Страница 46: ...SPECIFICATIONS C 4 ...
Страница 54: ...INDEX Index 4 ...
Страница 55: ......