1.
Before any operation or maintenance work read this documentation. Particularly, any
person responsible for operation of the device/system within the framework of operation
and service is obliged to do it. If there is no trained personnel with required technical
skills, ongoing inspections shall be carried out by the SMAY Service or Authorized SMAY
Service Point.
2.
No damage to the “ZUP” unit resulting from failure to observe the guidelines given in the
documentation shall be repaired under the warranty.
3.
Service operations at the “ZUP” unit sha
ll be carried out only when the unit is OFF. In
order to ensure safe operation of the device, a main switch is mounted on the unit
housing. It is used for manual disconnecting power supply from the device for service
work.
SMAY Sp. z o.o.
Recommendations Regarding Maintenance of the “ZUP” Power Supply
Unit
The “ZUP” power supply unit, according to the Act published in the
Journal of Laws 1994 No. 89,
item 414 on 7 July 1994,
should be put under inspection at least once a year. During the yearly
inspection the following shall be carried out:
-
checking for proper operation of individual component modules of the power supply unit
-
carrying out all possible control operations of the power supply unit according to the
device function list assumed by the designer of the system supplied (pay special attention
to the fire scenario)
-
measuring fire protection effectiveness
ATTENTION!
In case of blackout it is not possible to charge the batteries, but they will provide power
supply needed to maintain the panel operation. The reason for the failure shall be removed as
soon as possible in order to avoid disconnection in case of deep discharge; the batteries shall be
recharged and the device safety operation shall be ensured. In case of critically low state of
batteries charge and the lack of recharging, a risk of permanent damage to batteries occurs after
few days.
The batteries should be tested at least once a year. In case of decommissioning or
temporary shutdown of the unit, disconnect the batteries to avoid deep discharge or damage.
Charged but disconnected batteries may be stored for approx. 6 months. In case of long-term
storage it is necessary to charge up the batteries.
Содержание ZUP
Страница 6: ...Rev 1 2 of 12 2020 6 2 13 Declaration of Performance ...
Страница 7: ...Rev 1 2 of 12 2020 7 ...
Страница 8: ...Rev 1 2 of 12 2020 8 ...
Страница 43: ...Rev 1 2 of 12 2020 43 Annexes 14 13 ZUP Assembly and On site Launch Instruction Manual ...
Страница 44: ...Rev 1 2 of 12 2020 44 ...
Страница 45: ...Rev 1 2 of 12 2020 45 ...
Страница 46: ...Rev 1 2 of 12 2020 46 ...
Страница 47: ...Rev 1 2 of 12 2020 47 ...