2.

 

INSTALLATION TECHNOLOGY 

 RIGID WALL STRUCTURE 

 

1.

 

Make an opening in the wall - 230 [mm] (acceptable 210 

÷ 250

 [mm]) greater than the dimension 

B and 100 [mm] (acceptable 80 

÷ 

120 [mm])  greater than the dimension H, i.e.  B+230 i H+100. 

2.

 

Insert  the  closed  damper  into  the  assembly  opening  and  support  or  suspend  it  so  that  the 
actuator cover on the side of the thermal release  is flush with the wall surface. The damper 
should be protected against possible undesirable stresses, which could lead to deflection of the 
body, e.g. by using assembly struts.  

3.

 

After setting the damper as described, fill the space above and below the actuator housing with 
the  native  material of the wall, and then fill the  gap between the  damper and the  wall with 
cement mortar, cement-lime mortar or concrete. 

4.

 

After the mortar has dried (approx. 48 hours), remove the struts, supports or suspensions which 
were  used to install the  damper. Check  the  correct operation of the  damper, then leave  the 
damper in the open position. 

5.

 

Secure  the  fire  passage  with  a  GKF  15x150  [mm]  board  band  on  both  sides  of  the  building 
partition, then cover the flanges with PROMASTOP-CC Liquid or PROMASTOP-E Coating. 

 

 

 

Fig. 1. Assembly diagram of the WKZ-O fire damper in rigid wall structures with a horizontal axis of the blades 

rotation.  

 

Содержание WKZ-O

Страница 1: ...e 1 z 5 IM WKZ O Version 1 00 Edited 19 05 21 SMAY Sp z o o ul Ciepłownicza 29 31 587 Kraków tel 48 12 680 20 80 e mail info smay eu www smay eu Fire Ventilation Zone INSTALLATION MANUAL WKZ O Fire Dampers ...

Страница 2: ... sensitivity Closure opening during test at the right moment and in allowable time Pass Response time closure time Pass Operational relisbility 10 000 cycles pass Fire resistance Fire integrity E Fire insulation l Smoke leakage S Mechanical stability under E Cross section preservation under E EI 240 ve i o S Durability response delay operational reliability Pass Pass ...

Страница 3: ...age 3 z 5 IM WKZ O Version 1 00 Edited 19 05 21 Version 1 00 SMAY reserves the right to modify this document Contents 1 DEVICE INSTALLATION INSTRUCTION 4 2 INSTALLATION TECHNOLOGY RIGID WALL STRUCTURE 5 ...

Страница 4: ...y damage to the elements of the damper To maintain EIS240 declared resistance insulation and smoke leakage the damper should be mounted in walls which were tested and rated as EI240 It is acceptable to use WKZ O dampers in walls with other fire resistance rating but in such a case it should be kept in mind that EI fire resistance rating of the whole WKZ O damper installation is equal to the fire r...

Страница 5: ...y using assembly struts 3 After setting the damper as described fill the space above and below the actuator housing with the native material of the wall and then fill the gap between the damper and the wall with cement mortar cement lime mortar or concrete 4 After the mortar has dried approx 48 hours remove the struts supports or suspensions which were used to install the damper Check the correct ...

Отзывы: