 HIGH WALL THICKNESS CONSTRUCTION 

 

 

Figure 11. Installation method of fire dampers KTS in high wall thickness constructions 

In rigid and flexible wall construction and in ceiling with thickness  less or equal to 150 [mm], KTS fire dampers are 

mounted in such a way that the damper installation limit, i.e. 52 [mm], is maintained and the damper embossing must 

be on boundary of the building. 
 

Whereas in case of walls and ceilings with thickness higher than 150 [mm]: the KTS fire dampers are mounted in such 

a  way, that the damper installation limit i.e. 215 [mm], is maintained and the damper flange must be on boundary of 

the building (as in figure 11). 

 

 

Содержание KTS

Страница 1: ...a v https www smay eu Installation manual KTS Fire Damper round ...

Страница 2: ...es to this document TABLE OF CONTENT INSTALLATION TECHNOLOGY 2 I INSTALLATION TECHNOLOGY CEILING 3 II INSTALLATION TECHNOLOGY RIGID WALL 4 III INSTALLATION TECHNOLOGY FLEXIBLE WALL 6 IV INSTALLATION TECHNOLOGY HIGH WALL THICKNESS CONSTRUCTION 9 V INSTALLATION TECHNOLOGY INSTALLATION AWAY FROM WALL CONSTRUCTION SILICATE BOARDS 10 ...

Страница 3: ...ponents of fire damper by damage Dampers to preserve of the declared resistance insulation and smoke leakage EIS120 EIS90 EIS60 EIS30 should be installed on wall which was classified as EIS120 EIS90 EIS60 EIS30 It is allowed to install KTS dampers in wall with other fire resistance should be remembered that fire resistance in this situation is resistance of lowest classified in this regard element...

Страница 4: ... e the damper embossing must be on boundary of the building and installation opening axis must coincide with fire damper axis c After setting the fire damper as described mounting the mounting brackets fill the gap between the fire damper and the ceiling with cement cement lime mortar or concrete d After drying of the mortar approx 48 hours remove used supports or suspension check the fire damper ...

Страница 5: ... dimension of the building i e the damper embossing must be on boundary of the building and installation opening axis must coincide with fire damper axis c After setting the fire damper as described fill the gap between the fire damper and the wall with cement cement lime mortar or concrete d After drying of the mortar approx 48 hours remove used supports or suspensions check the fire damper corre...

Страница 6: ...6 09 2022 r Page 5 of 10 Installation manual KTS Figure 4 Installation of KTS in rigid wall construction with vertical axis of rotation of the damper Figure 5 Installation of KTS in rigid wall construction with 115 mm wall thickness ...

Страница 7: ...er setting the fire damper as described fill the gap between the fire damper and the wall with non flammable mineral wool of high density 100 kg m3 or more d Seal the place of filling with mineral wool using the sealing compounds Hilti Firestop Coating CP 673 Promastop Coating Promaseal Mastic or Soudal Firesilicone B1 FR e Mount collar both side of wall made of GKF boards 12 5 mm thick and DN 350...

Страница 8: ...2022 r Page 7 of 10 Installation manual KTS Figure 7 Installation method of fire dampers KTS in flexible wall with 100 mm thickness Figure 8 Installation method of fire dampers KTS in flexible wall with horizontal rotation axis of baffle ...

Страница 9: ...2022 r Page 8 of 10 Installation manual KTS Figure 9 Installation method of fire dampers KTS in flexible wall with vertical rotation axis of baffle Figure 10 Installation method of fire dampers KTS in flexible wall with 125 mm thickness ...

Страница 10: ...nd in ceiling with thickness less or equal to 150 mm KTS fire dampers are mounted in such a way that the damper installation limit i e 52 mm is maintained and the damper embossing must be on boundary of the building Whereas in case of walls and ceilings with thickness higher than 150 mm the KTS fire dampers are mounted in such a way that the damper installation limit i e 215 mm is maintained and t...

Страница 11: ...ained c Mount the damper to ventilation duct additionally support or suspend it d On the mineral wool coverage section apply 1 mm PROMASTOP Coating made by PROMAT layer e The PROMASTOP Coating layer has to be applied on fire barrier in the place where the wool was sealed on both sides with a size about DN 300 f Wrap the ventilation duct and the damper at the appropriate length of mineral wool with...

Отзывы: