background image

 

 

 

 

 

BEFORE YOU START:

 

 

• 

Read all instructions carefully

 

• 

Identify all parts and check quantities against parts list

 

• 

Select a level site

 

• 

Do not mark cladding with pencil as lead can cause corrosion to cladding

 

• 

During assembly, ensure all drill filings are removed between  layers of steel, before riveting together

 

 

 

SAFETY:

 

 

• 

Do not attempt to build your shed in high winds

 

• 

Beware of sharp edges, we recommend that you use gloves

 

• 

Protect your eyes and ears

 

• 

For ease of assembly, use a friend to help 

 

 

 

TOOLS REQUIRED:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WARRANTY REQUIREMENTS

:

 

 

The following maintenance process needs to be adhered to, to qualify for the steel warranty of your Duratuf Smart store 

shed.

 

 

 

• 

Wash all surfaces annually using a hose and soft nylon brush.

 

• 

Within 2 km of coast –

 

wash every 3 months as above. After a storm, wash the cladding and the gutters as soon 

as possible to remove any highly corrosive salt deposits.

 

• 

Volcanic Ash Fallout –

 

wash as soon as possible, removing fall out from roof and gutters.

 

• 

Do not allow manures, chemicals or other corrosive materials to have direct contact with cladding

.

 

CONGRATULATIONS ON PURCHASING A DURATUF SMART STORE SHED. 

 

BEFORE YOU BEGIN THE ASSEMBLY PLEASE NOTE SOME IMPORTANT POINTS:

 

2

 

DRILL

 

RIVETER

 

3.5mm DRILL BIT

 

HAMMER

 

LADDER

 

TAPE MEASURE

 

HEX DRIVE

 

NAIL PUNCH

 

SQUARE DRILL BIT

 

SKILL SAW 

 

(timber floor only)

 

Содержание SM2515

Страница 1: ...ASSEMBLY INSTRUCTIONS SM2515 BASE SIZE 2 520m x 1 520m...

Страница 2: ......

Страница 3: ...cess needs to be adhered to to qualify for the steel warranty of your Duratuf Smart store shed Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as...

Страница 4: ...l 1 980m 3 Back Wall 1 890m 5 Side Wall Angle 1 965m 2 Side Wall Angle 1 935m 2 Side Wall Angle 1 905m 2 Roof 1 720m 5 Door Sheet Narrow 1 940m 2 Door Sides 1 940m 2 Door Jamb 1 980m 2 Door Brace 1 20...

Страница 5: ...ACK 2 TIMBER PACK DESCRIPTION QTY DIAGRAM Front Back Bottom Plates H4 Green 2 520 m 2 Front Back Top Plate H1 Red 2 520 m 2 Side Wall Bottom Plates H4 Green 1 520 m 2 Side Wall Top Plates H1 Red 1 522...

Страница 6: ...ION 2 ASSEMBLE DOOR QUICK OVERVIEW Top Plate Back Side Wall Sheets Barge Flashing Spouting Roof Sheets Top Plate Side Top Plate Front Bottom Plate Front Bottom Plate Side Back Wall Sheets Front Wall S...

Страница 7: ...ng through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom...

Страница 8: ...m flashings and assemble door as shown Drill and rivet as per diagram STEP 4 On the back of the door place door braces in posi tion as shown in fig 3 Ensure that the top and bottom ends of the braces...

Страница 9: ...with bottom of sheets flush with each other Rivet sheets together on overlaps as shown STEP 3 Nail wall sheets to the Top Plate at each end making sure that the top of the sheets are flush with the t...

Страница 10: ...ts to the Top Plate at each end making sure that the top of the sheets are flush with the top of the Top Plate and that the sides of the wall sheets overhang the Top Plate by 15mm as shown Check that...

Страница 11: ...e Plates are the correct distance apart and that the sides of the wall sheet overhang the Bottom Plate by 15mm Drill rivet Door Jamb Flashings to wall sheets using four riv ets equally spaced on each...

Страница 12: ...Using 2 x 40mm screws screw Top Plates together in the corner Using 2 x 40mm screws 2 per join screw the Bottom Plates together in the corner STEP 2 Repeat Step 1 with the second Side Panel ensuring...

Страница 13: ...ribs on the Roof Sheets line up with ribs on the Wall Sheets fig 2 STEP 3 Ensure the Front and Back Top Plates are straight Screw the roof sheets to the front back Top Plates using 1 x Roofing Screw...

Страница 14: ...EMOVE ALL DRILL FILINGS FROM ROOF WALLS AND CHANNELS THOROUGHLY FAILURE TO DO THIS WILL RESULT IN CORROSION AND COULD THEREFORE VOID THE WARRANTY FIT PADBOLT Rivet Padbolt to door and keeper onto Door...

Страница 15: ......

Страница 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Отзывы: