
10
11
5
Installation
Caution
• This product requires 120V usage.
• Please do not plug in the electrical cord prior to installation.
• Please consult with a licensed electrician if electrical work is needed. In case a grounded outlet
is not available, grounding should be done in order to prevent short circuits or electric shock.
Check the water valve
Installation steps
Check the water valve in the bathroom. You may need to consider purchasing additional components.
For the following case, the T-valve alone is sufficient for connection.
Shut water supply by turning it to the right.
Place the bolt into the bolt case and align it with
the top of the base plate. Insert the bolt with bolt
case onto the base plate. After this is done, hold the
bolts, gently slide it into the bottom of the unit until
it clicks in place. You will hear a click sound. Please
do NOT use force.
Once the base plate is attached to the unit, align the
unit and toilet fixture facing front, and then insert
the mounting bolts to the toilet mounting holes.
Please do not over tighten the nut.
Install the main unit and insert the mounting
bolts to the toilet mounting holes.
Connect the flexible tube from side of
T-valve to the unit. Turn the water
valve to the left to allow water to flow.
※
Customers should use the new hose set provided
with the product. Do not use used set again.
Disconnect existing hose from water tank.
Connect the T-valve to the water tank.
Connect the water supply hose to the
assembled T-valve.
Remove existing seat and lid.
• Water supply valve
Minus home
Handle
Inner bolt for water valve
• Inner bolt water valve
• Release the bolts on both
sides of the existing toilet
seat to remove the seat
and lid.
• Store the removed seat,
nut and water hose in a
safe area in case you
move or it needs to be
reinstalled.
Water supply hose
Installed bolt case
Cone Packing
Cone Packing
Back
Bolt
Water supply hose
Water supply valve
Nut
Nut
Base plate
Bolt
• Professional engineering is needed for plumbing work
on specialized water pipes and flush valve pipes.
• Please consult with a qualified specialist.
• Please put the unused water hose in a secure area.
1
5
7
6
8
2
3
4
Exisiting toilet
seat
Toilet
body
Nut
T-valve
(with packing)
Water Tank
Shut off Valve