
25
ENGLISH
ENGLISH
Setup
Unpack the unit and accessories. The package contains:
ACS-P unit and electronic scale
Low-side and high-side services hoses and quick-action coupler valves
Oil filler cap
Operating manual and warranty
Before the first use:
1.
Place the unit on a level surface.
2.
Put the refrigerant tank on the scale.
3.
Remove aluminum foil from the vacuum pump and install oil filler cap.
4.
Connect the refrigerant hose to the refrigerant tank.
5.
Connect service hoses to the service ports located below pressure gauges.
6.
Connect quick-action coupler valves to the service hoses (DO NOT OVERTIGHTEN).
7.
Plug the power cable into a grounded power outlet.
8.
Turn on the power switch.
WARNING:
Scale is calibrated at the factory, re-calibration is not necessary.