![Smart-G SSB10 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/smart-g/ssb10/ssb10_operation-manual_1296895020.webp)
Electric wiring
For this product, AC220V power source is necessary
Electric wiring
Caution f
or electric wiring work, inquire a professional electrical company
must be grounded
ㆍ
Grounding
ㆍ
It should be install grounding work to prevent from an electric shock
and short circuit by leakage an electric current boiler
ㆍ
Connecting grounding wire with metal piece and bury it in
humid underground. (30cm)
Connection ground with metal water pipe is also fine.
Ground wire diameter should be more than 1.15
㎟
.
Ground
ㆍ
If you use power outlet where ground terminal is built-in,
terminal
additional grounding is unnecessary.(see figure right)
ㆍ
In 110V area, if you want to increase voltage to 220V,
grounding must be done. In this case, allowed transmitter
capacity is 1kW/h more.
Gas pipe
Telephone
Line
1.The material of gas joint between gas heater and gas piping should use for the approval of good
qualifications. (standard certified )
2.Connect with pipe diameter of 15A(PT1/2 ) to RW-14, RW-18 Model.
Connect with pipe diameter of 20A(PT1/2 ) to RW-24 Models.
3.Finishing the connection, Must be check the gas leaking test.
4.The supply intermediate gas valve Installed the near the product with easy to open and close.
5.Before the connecting the joint, Teflon coating must be wrapped a screw thread.
For gas pipe work, contact a gas pipe work provider.
Warning
Gas piping construction
Never ground to gas pipe, telephone line or
lightning arrester. Otherwise, there may be
Warning danger of gas explosion or fire by lightning.
Ground terminal
Pipe Construction
20
Содержание SSB10
Страница 18: ...Installation 18 ...
Страница 29: ...Wiring Parameter setting 30K 35K 40K 10K 13K 16K 29 ...