6 Electrical Connection
SMA Solar Technology AG
32
MC-BOX-6_12-BE-en-20
Operating Manual
4. Loosen the screws of the two-part cable
feed-through.
5. Remove the half without the T-shaped fastening
pieces.
6. Lay the data cable for communication and the data
cable for control and measuring signals of sufficient
length from the cable feed-through with the
T-shaped mounting tab to the desired connection
point and secure it with cable ties.
7. Bolt the halves back together. Fasten the screws
hand-tight.
The data cables and placeholders (plastic stick)
must be firmly pressed between both sides of the
two-part cable feed-through. This ensures tightness
of the enclosure.
8. Position the cable feed-through including the cable
from the outside in the enclosure.
9. Position the mounting plate of the two-part cable
feed-through and fasten it hand-tight.
10. Repeat steps 1 to 9 for the remaining data cables.
Use the second two-part cable feed-through.
Содержание Sunny Island MULTICLUSTER BOX 12.3
Страница 1: ...MC BOX 6_12 BE en 20 Version 2 0 ENGLISH Operating Manual Multicluster Box 6 3 12 3 ...
Страница 47: ......
Страница 48: ...www SMA Solar com SMA Solar Technology ...