13 Decommissioning the Inverter
SMA Solar Technology AG
Operating manual
SHP-US-20-BE-en-10
82
13 Decommissioning the Inverter
To decommission the inverter completely upon completion of its service life, proceed as described
in this Section.
CAUTION
Risk of injury due to weight of product
Injuries may result if the product is lifted incorrectly or dropped while being transported or
mounted.
• Transport and lift the product carefully. Take the weight of the product into account.
• Wear suitable personal protective equipment for all work on the product.
• Transport the product using the carrying handles or hoist. Take the weight of the product
into account.
• Use all carrying handles provided during transport with carrying handles.
• Do not use the carrying handles as attachment points for hoist equipment (e.g. straps, ropes,
chains). Insert eye bolts into threads provided on top of the product to attach the hoist
system.
Requirements:
☐ Original packaging or packaging suitable for the weight and dimensions of the product must
be available.
☐ A pallet must be available.
☐ Mounting material for attaching the packaging on the pallet (e.g. tie-down straps)
☐ All transport handles must be in place.
Procedure:
1.
DANGER
Danger to life due to high voltages
• Disconnect the inverter from all voltage sources (see Section 10, page 58).
Содержание SHP 125-US-20
Страница 1: ...SMA SUNNY HIGHPOWER SHP US 20 BE en 10 Version 1 0 ENGLISH Operating manual SUNNY HIGHPOWER PEAK3 US...
Страница 95: ......
Страница 96: ...www SMA Solar com...