7 Electrical Connection
SMA Solar Technology AG
26
MC_BOX_36-BE-en-20
Operating Manual
12. Turn the handle of the fuse holder up.
13. Connect the grounding conductor to the grounding
busbar (AF 19, torque: 25 Nm). Make sure to
adhere to the following screw assembly:
screw head / grounding busbar / terminal lug /
fender washer / spring washer / nut.
14. Connect the neutral conductor to the busbar
MC-X1
(AF 19, torque: 25 Nm). Make sure to
adhere to the following screw assembly:
screw head / busbar / terminal lug / fender
washer / spring washer / nut.
15. Attach the connection cable to the designated cable support rail. Use the cable clamps and
counter sleeves supplied.
Securing the cable in the support rail relieves the strain on the cable at the connection point.
Содержание MULTICLUSTER BOX 36
Страница 1: ...MC_BOX_36 BE en 20 Version 2 0 ENGLISH Operating Manual MULTICLUSTER BOX 36...
Страница 47: ......
Страница 48: ...www SMA Solar com SMA Solar Technology...