Pin group
Relay
Pin
Signal
Explanation
Digital output 3
C
B1
NC
Back contact
B2
CO
Change-over con-
tact
B3
NO
Front contact
Procedure:
1. Connect the connection cable to the remote terminal (see the manual from manufacturer). Trim
the unneeded insulated conductors up to the cable shield and note down the conductor colors.
2. Connect the connection cable to the six-pole plug:
• Depending on the remote terminal and the pin assignment of the pin group, identify the
conductor entries that are required for connecting the connection cable.
• Release the required conductor entries using a screwdriver and insert the insulated
conductors into the conductor entries. Observe the pin assignment.
3. Insert the six-pole plug at terminal
X2
into pin row
A
or
B
.
4. On the connection cable, mark the terminal and the pin row to which the connection cable is
assigned. Use the supplied cable tie with caption field.
5. Write down the terminal assignment on the supplied supplementary sheet.
6.12.5.3 Connecting a Remote Terminal for Feedback via Analog Signal
Via the pin groups
Analog current output 1
,
Analog current output 2
, and
Analog current
output 3
of terminal
X6
you can give the grid operator feedback, for example, if and which
specifications for the grid management services are currently implemented in the system. Which
feedback options were set at the factory for terminal
X6
and its pin groups, is described in a
previous section (see Section 6.2, page 26). The feedback options that you can choose from can
be found in the menu
Settings
on the user interface of the Cluster Controller.
Requirements:
☐ The remote terminal must be technically suitable for connection to the analog outputs (see
☐ The connection cable must be prepared for connection to the multipole plug (see Section 6.5,
6 Connection and Commissioning
SMA Solar Technology AG
Installation Manual
59
ClusterController-IA-en-15
Содержание CLCON-10
Страница 1: ...Installation Manual SMA CLUSTER CONTROLLER ClusterController IA en 15 Version 1 5 ENGLISH ...
Страница 85: ......
Страница 86: ...SMA Solar Technology www SMA Solar com ...