background image

INSTRUC TIONS

D

B

A

C

Section A: Contains  leading edge web-

bing, and leading edge ring.  This is where 

loop to loop connection is made.    

Section B: Contains trailing edge ring,  and 
leach line attachment point.

Section C:  This is your leading edge bridle 
end.

Section D:  This is your trailing edge bridle 
end.   

FINISHED ATL SETUP

Leading 
Edge

Trailing Edge

Leading Edge 
Bridle

Trailing Edge 
Bridle

ATL INSTALLATION

Отзывы: