13
6367
7
2021
-
SE170
For
Stern Thruster
installation please refer to the supplied manual in your Sleipner product delivery
Stern Thruster
SLEIPNER AS
P.O. Box 519
N-1612 Fredrikstad
Norway
www.sleipnergroup.com
DOCUMENT ID:
REVISION:
DATE:
LANGUAGE:
Installation Guide
Stern Tunnel Installation
MC_0003
MG_0005
R
D
1
2
3
4
6
5
8 x layers of fiberglass
and resin
8 x layers of fiberglass
and resin
MG_0006
R = D x 0,1
R = D x 0,1
D x
0,1
-0,1
5
D x
0,1
-0,
15
D
Layers of
fiberglass
and resin
Layers of
fiberglass
and resin
*Fiberglass
Hull
*Steel/
Aluminium
Hull
Hull
Hull
Hull
Tunnel
Tunnel
Tunnel
Welding
Layers of
fiberglass
and resin
Additional Layers of
fiberglass and resin
Additional Layers of
fiberglass and resin
Hull
1
3
4
2
IMPORTANT
Avoid all casting where the motor-bracket is to be placed, as this will cause misfi t and possible failure to the gear house.
Tunnel Installation
With tunnel installed and cast.
1. Round the edges with a radius of 10% of the tunnel diameter.
2. For steel/ aluminium hulls make a slope with a length of 10-15% of the tunnel diameter.
(NB: If this is not possible, round the tunnel end as much as possible.)
3. Additionally cast two layers on the outside of the tunnel/ hull in a 10cm area
4. Follow the same method if making the deflector/ spoiler.
You must apply gel coat to areas you have grounded/ moulded to make waterproof. These areas allow water access to the hull which is typically not
waterproof without these applications outside.
(NB: All original Side-Power tunnels are fully waterproof when delivered except in the areas where
you have cut and bonded it to the hull.)
MC_0003
Содержание SE170
Страница 25: ...25 6367 7 2021 SE170 MC_0037 Notes...
Страница 26: ...26 6367 7 2021 SE170 MC_0037 Notes...
Страница 27: ...27 6367 7 2021 SE170 MC_0037 Notes...