Sleipner SE-IP50 Скачать руководство пользователя страница 6

6

4526

11

2021

-

SE IP 50

 

important

MG_0001

A

B

Pivot
point

1

Ø

2

Lowered rotation power performance

Stronger rotation power performance 

min 1/4

Ø

 

(Recommended)

min 1/4

Ø

 

(Recommended)

WD

Water line

Positioning of the tunnel / thruster

MC_0003

Aim to install the thruster as far forward as possible (1)

Due to the leverage effect around the boats’ pivot point. The distance difference from the boat pivots’ point to the thruster will determine the amount 

of real rotation power for the boat. 

 

Aim to install the thruster as deep as possible under the waterline (2)

Deeper installations prevent air from being sucked into the tunnel from the surface, resulting in reduced thrust performance and increase noise levels 

during operation. Deeper installations increase water pressure for maximum effi ciency from the thruster.

The centre of the tunnel should be a minimum of 1 x the tunnel diameter below the waterline. The installer must make evaluations based on thruster 

performance, boat type and operating conditions. As a general recommendation, the position of the tunnel should not be a minimum of 1/4 of the 

diameter of the tunnel from the boat keel. 

(NB: This can be overlooked depending on the installation methods defi ned in this manual.) 

Содержание SE-IP50

Страница 1: ...EIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Installation Guide For Ignition Protected DC Electric Thruster Models SE IP50 EN I M 4526 11 20...

Страница 2: ...ositioning of the tunnel thruster 6 Tunnel Length 7 Tunnel installation in sail boats 8 Water Deflection 9 Tunnel ends 10 Tunnel installation 11 12 Stern tunnel installation 13 Gear Leg Motor Bracket...

Страница 3: ...onal and national regulations It is the responsibility of the installer to follow all applicable international and national regulations when installing Sleipner products The recommendations given in t...

Страница 4: ...Water Depth 140 5 51 140 5 51 TL Minimum tunnel length 124 4 88 124 4 88 TL recommended Recommended tunnel length 152 5 98 152 5 98 T min Minimum tunnel wall thickness 5 0 20 5 0 20 T max Maximum tunn...

Страница 5: ...ce protects against sudden change of drive direction The electric thermal cut off switch in electro motor protects against overheating auto reset when electro motor cools down Flexible coupling betwee...

Страница 6: ...eep as possible under the waterline 2 Deeper installations prevent air from being sucked into the tunnel from the surface resulting in reduced thrust performance and increase noise levels during opera...

Страница 7: ...of the tunnel walls to vary in length excessively EG The top tunnel wall is x 4 longer than the bottom wall 2 If the tunnel is too long the friction inside will reduce the water speed and thereby the...

Страница 8: ...the tunnel halfway into the underneath section of the existing hull Strengthen it with a deflector spoiler directing the water flow around the tunnel This will allow installation of the thruster in t...

Страница 9: ...angled slightly down because of the water flow on this area 3 Making a deflector spoiler in front and underneath the tunnel can also reduce damage to the thruster and drag The deflector spoiler will p...

Страница 10: ...and thereby reduces the effective tunnel diameter and thrust Turbulence cavitation on the propeller will lessen the thrusters performance and create excess noise 2 For steel aluminium hulls angled tu...

Страница 11: ...the back face 5 Cut the tunnel ends to the desired shape and lightly sand its surface Clean the area with acetone or similar where you are going to apply breglass NB Do not cast or add breglass to the...

Страница 12: ...installed and cast 1 Round the edges with a radius of 10 of the tunnel diameter 2 For steel aluminium hulls make a slope with a length of 10 15 of the tunnel diameter NB If this is not possible round...

Страница 13: ...ation please refer to the supplied manual in your Sleipner product delivery Stern Thruster SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE In...

Страница 14: ...y with the same clearance from each blade to the tunnel wall Place top motor bracket to measure the drive shaft has come through the motor bracket at the correct height Remove the gear leg and propell...

Страница 15: ...the propeller until the drive pin aligns with the internal slot in the propeller 2 Insert the washer to the end of the shaft spline Tighten with the propeller lock nut 3 Apply anti fouling to the gea...

Страница 16: ...s on the motors top cap 4 Fasten the bolts holding the motor to the motor bracket with the above torque 5 Check the drive shafts are engaged by rotating the propeller NB Rotating the propellers can be...

Страница 17: ...as possible and ensure the main positive lead can take loads without noticeable voltage drop Ensure the main switch battery isolator can be turned off independently and manually when not on board or...

Страница 18: ...A AWG 2 0 2 0 4 0 2 x 2 0 2 x 3 0 2 x 3 0 2 x 4 0 2 x 4 0 2 x 4 0 24 V 280 A DIN 300 SAE 570 EN 520 ANL 250 mm2 35 35 35 50 50 70 70 95 95 120 120 2 x 95 AWG 2 2 2 1 0 1 0 2 0 2 0 3 0 3 0 4 0 4 0 2 x...

Страница 19: ...x on SP75Ti SP95Ti and SP125Ti NB Make sure to not use any electronic interface box delay box older than the 6 1232i ex 6 122x NB Very important to check the following with main switch position After...

Страница 20: ...Fuse Battery main switch 1 5 4 2 6 8 9 red grey sig blue sig black red grey sig blue sig brown 3 red Fused inside 1A black 7 white NB Make sure to not use any electronic interface box delay box older...

Страница 21: ...the same time in opposite directions the electronic control box will stop the thruster until it receives a single signal or thrust in one direction Sleipner on off equipment it is entirely plug play a...

Страница 22: ...n For Control Panel installation please refer to the supplied manual in your Sleipner product delivery MC_0398 SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVIS...

Страница 23: ...house and propeller but NOT anodes sealing rubber ttings or propeller shafts Propeller is fastened correctly to the shaft Propeller turns freely in tunnel The anode and or holding screw is tightened w...

Страница 24: ...d to the Purchaser at the Warrantor s expense If on the other hand the claim is determined to result from circumstances such as described in section 4 above or a result of wear and tear exceeding that...

Страница 25: ...25 4526 11 2021 SE IP 50 MC_0037 Notes...

Страница 26: ...26 4526 11 2021 SE IP 50 MC_0037 Notes...

Страница 27: ...27 4526 11 2021 SE IP 50 MC_0037 Notes...

Страница 28: ...accuracies or omissions it may contain Continuous product improvement may change the product speci cations without notice Therefore Sleipner Motor AS can not accept liability for any possible differen...

Отзывы: