
3
6752
2
2021
-
PPC
DECLARATION OF CONFORMITY
Sleipner Motor AS
P.O. Box 519, Arne Svendsensgt. 6-8
N-1612 Fredrikstad, Norway
Declare that this product with accompanying standard control systems complies with the
essential health and safety requirements according to:
DIRECTIVE 2013/53/EU
DIRECTIVE 2014/30/EU
DIRECTIVE 2014/35/EU
MC_0020
MC_0105
Considerations and Precautions
EN
IMPORTANT
If installing S-link products DO NOT connect any other control equipment to the S-link controlled products except Sleipner original S-link
products or via a Sleipner supplied interface product made for interfacing with other controls. Any attempt to directly control or at all connect
into the S-link control system without the designated and approved interface will render all warranties and responsibilities for the complete
line of Sleipner products connected void and null. If you are interfacing by agreement with Sleipner and through a designated Sleipner
supplied interface, you are still required to also install at least one original Sleipner control panel to enable effi cient troubleshooting if
necessary.
It is the installers responsibility
When installing Sleipner equipment follow the outlined regulations/ classifi cation rules (electrical/ mechanical) according to
international or special national regulations. Instructions in this guide cannot be guaranteed to comply with global electric/
mechanic regulations/ classifi cation rules.
Follow all health and safety laws in accordance with their local outlined regulations/ classifi cation rules.
Before installation, it is important that the installer reads this guide to ensure necessary acquaintance with the product.
The recommendations made in this manual are guidelines ONLY, and Sleipner Motor AS (Sleipner) strongly recommend that before
installation, advice is obtained from a naval architect familiar with the particular vessel and regulations/ classifi cations.
This manual is intended to support educated/ experienced staff and is therefore not suffi cient in all details for professional
installation.
(NB: These instructions are only general instruction. If you are not skilled to do this work, please contact professional
installers for assistance.)
All electrical work must be done by a licensed professional.
Faulty installation of Sleipner products will render all warranty given by Sleipner Motor AS void.
MC_0038
MC_0342
PPC Considerations and Precautions
EN
• The PPC Power control unit should be installed in a dry, ventilated place - cable connections facing down. Mount unit with battery positive cable
branching out at unit terminal, not at thruster motor. Allow free space at min 200mm over, 150mm under and min. 100mm in front and at sides. Take
into consideration that a 5m multi-cable shall be plugged in between thruster motor and PPC unit.
Содержание 7070969017619
Страница 11: ...11 6752 2 2021 PPC MC_0037 Notes EN...