SLEIPNER MOTOR AS Side-Power Automatic Main Switch Скачать руководство пользователя страница 8

8

5169

2

2020

-

MG_0329

DESCRIPTION OF WIRING DIAGRAMS:

- Install the correct main fuse depending on thruster model fitted.

- Coil feed can be taken from any 12V or 24V battery source. If the coil is fed from a source that already has a main switch, an    

  on/off switch is not required.

- The S-Link cable must be connected to the S-Link network on the Automatic Main Switch assigned to be bow or stern 

IMPORTANT

Fit only one thruster to each 

automatic main switch.

Technical Wiring Diagram

EN

Thruster

Battery

12/24V

-

black

red

«B

5A

+12/24V

Automatic Main Switch

8977 12 (12V)

8977 24 (24V)

Side-power S-link

network cables

«T

hr

us

te

r+

»

To

SEP thruster

or

RETRACT thruster

+

-

+

-

on/off

Switch

(optional)

Main

fuse

Coil feed

Содержание Side-Power Automatic Main Switch

Страница 1: ...Made in Norway Sleipner Motor AS 2020 SLEIPNER MOTOR AS P O Box 519 N 1612 Fredrikstad Norway www side power com Document id Revision Date 5169 2 Installation Manual Automatic Main Switch S Link 2020...

Страница 2: ...l health and safety requirements according to DIRECTIVE 2013 53 EU DIRECTIVE 2014 30 EU DIRECTIVE 2014 35 EU MC_0020 Installation Instructions Considerations and Precautions 3 Measurements 4 Specifica...

Страница 3: ...nal installation NB These instructions are only general instruction If you are not skilled to do this work please contact professional installers for assistance All electrical work must be done by a l...

Страница 4: ...6 L Length 205 8 1 W Width 79 3 11 W Width including fasteners 90 3 54 a Attachment hole from the top 51 5 2 03 b Attachment hole from the bottom 92 8 3 65 c Attachment hole from the side 37 5 1 5 d D...

Страница 5: ...5 5169 2 2020 MG_0327 Manual over ride button Push to shut OFF Pull to activate ON Fuse holder Main cable s from battery ies Main cable s to the thruster Automatic Main Switch EN...

Страница 6: ...el bolts Fitting the thruster cables 5 Remove the nuts and washers 6 Fit the cable cables as shown directly onto the pre fitted conductor 7 Assemble the washers in the sequence shown 8 Tighten the end...

Страница 7: ...for deciding the main cable sizes the lengths are the total of positive and negative from the battery Please refer to the graphic for special considerations relating to your model MG_0328 12 24V 5A S...

Страница 8: ...off switch is not required The S Link cable must be connected to the S Link network on the Automatic Main Switch assigned to be bow or stern IMPORTANT Fit only one thruster to each automatic main swi...

Страница 9: ...ctivate Fuse is blown Replace the fuse or check if the main cable from the battery and main cable to the thruster Communication fail The panel has no communication with the main switch Check S link or...

Страница 10: ...nt supplier that the installation instructions of the Installation and Operation Manual have been complied with and that the defect remains e warranty service shall be performed only by the Warrantor...

Страница 11: ...11 5169 2 2020 MC_0037 Notes EN...

Страница 12: ...cument was correct at the time it was published However Sleipner Motor AS can not accept liability for any inaccuracies or omissions it may contain Continuous product improvement may change the produc...

Отзывы: