6
Manual_MTR_2021-10-011.00_EN.docx
6
UNPACKING AND INSTALLATION
6.1
UNPACKING THE DEVICE
Remove the upper cover and the upper supporting foams.
Lift the device
out of the wooden transportation case.
For repacking use the original cases. Keep the packing material.
Place the device onto the selected bench.
6.2
INSTALLATION
The site for installation should meet the following requirements:
The unit should be positioned onto a plane, vibration-free surface.
A free ventilation of fresh air behind the device should be guaranteed.
The vicinity of the work area must be free of oil and chemical vapors.
6.3
ELECTRICAL POWER CONNECTION
Make sure that electric power is constant:
Connect the unit to the main supply and switch on with mains switch at the rear of the unit.
This should be examined during installation of the unit by a competent person.
Use a dedicated fuse for the unit.
Before turning on the device, check if the voltage of the mains supply is identical with the name
plate of the unit.
Содержание MTR
Страница 2: ......