IDP-782 - Hardware Guide
4 Installation
The following section contains recommended installation guidelines for the Solution Provider (SP). These
recommendations should be incorporated into installation guidelines for end users.
The installer is responsible for following all safety guidelines during product installation.
Refer to the
section for details.
The terminal uses very low power during transmission and therefore presents no radiation hazard during
normal use, installation, testing, and troubleshooting.
4.1 Getting Started
Getting the terminals ready for operation requires doing the following:
1. Prepare for the installation (Section 4.2)
2. Determine a suitable mounting location (Section 4.3)
3. Mount the antennas (Section 4.4)
4. Route the main cable (Section 4.5)
5. Connect to power (Section 4.6)
6. Connect the cables (Section 4.7)
7. Register the terminal (Section 4.8)
4.2 Prepare for the Installation
Check that you have the items and tools listed below before installing the terminal.
4.2.1 Shipping Box Contents
Unpack the contents of the shipping box(es) and use the list below as a guide to check that you received
the items you ordered.
l
IDP-782 transceiver unit
l
Cellular antenna with FAKRA connector
l
Power and I/O connector with crimp contacts
l
Satellite (standard or low elevation) antenna with FAKRA connector
l
Installation Guide
l
SIM door screw (optional)
l
Terminal shroud (optional)
4.2.2 Additional Materials
You might require some of the following materials to install a terminal. These materials do not ship with the
terminal:
T213, Version 02
48
© SkyWave Proprietary