SkyScan Field Pro Скачать руководство пользователя страница 3

 
 

1. 

Installation 

AC power installation 

Remove the two screws and open the swing door. 
Run 3/4” conduit and wiring to the compression fitting on the Control 
Enclosure. The AC adaptor in the Control Enclosure is a two pin isolated 
adaptor and does not require a ground connection. Connect the neutral 
(white) wire to the connector with the white wire already attached. 
Connect the hot line (black) to the connector with the black wire. Cap 
off the ground (green) wire with the wire nut supplied. 
During operation should the unit lose power, the internal backup battery 
will power the unit for up to one hour. This battery is charged during 
normal operation. 
The system should be hooked to the AC power source for an hour 
before operation to fully charge the battery. 

 

 

 

 

Interface Cables 

There are two cables, each 10’ long. The cable 
with 
the 8 pin connector connects the Control Enclosure 
to 
the Display Enclosure. Be sure to turn the locking 
collar 
tight after installing to insure a solid connection. 
The cable with the 4 pin connector connects the 
Display to the Horn assembly. 
Different cable lengths can be specially ordered. 

Отзывы: