background image

2

SUMMARY

1. Introduc

ti

on ...................................................................................... 3

1.1 Safety .................................................................................................................... 3

1.2 Main Components ................................................................................................. 5

1.3 Technical Characteristcs ......................................................................................... 6

2. Instala

ti

on and Pre-Opera

ti

on ............................................................ 6

2.1 Installa

ti

on ............................................................................................................ 6

2.1 Pre- Opera

ti

on ....................................................................................................... 7

3. Opera

ti

on .......................................................................................... 7

3.1 Star

ti

ng .................................................................................................................. 7

3.2 Opera

ti

ng Procedures ............................................................................................ 7

3.3 Cleaning ................................................................................................................. 8

3.4 Cau

ti

ons with Stainless Steel:  ................................................................................ 9

4. General Safety Prac

ti

ces .................................................................. 10

4.1 Basic Opera

ti

on Prac

ti

ces ......................................................................................10

4.2 Safety Procedures and Notes before Switching the Machine ON ...........................11

4.3 Rou

ti

ne Inspec

ti

on ................................................................................................11

4.7 Warning ................................................................................................................12

4.4 Opera

ti

on .............................................................................................................12

4.5 A

ft

er Finishing The Work .......................................................................................12

4.6 Maintenance ........................................................................................................12

5. Analysis and Problems Solving ......................................................... 13

5.1 Problem, causes and solu

ti

ons ..............................................................................13

6. Applicable Norms ............................................................................ 15

7. Electric Diagram ............................................................................... 16

19

___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________

Содержание ESB

Страница 1: ...AQUI CONTIDAS PODEM SER MODIFICADAS SEM AVISO PR VIO WWW SIEMSEN COM BR METAL RGICA SIEMSEN LTDA CNPJ 82 983 032 0001 19 Rua Anita Garibaldi n 262 Bairro S o Luiz CEP 88351 410 Brusque Santa Catarina...

Страница 2: ...________________________ ___________________________________________________________ ___________________________________________________________ _______________________________________________________...

Страница 3: ...______________ ___________________________________________________________ ___________________________________________________________ ___________________________________________________________ _____...

Страница 4: ...__________________________________________ ___________________________________________________________ ___________________________________________________________ _____________________________________...

Страница 5: ...nts are made with carefully selected materials in accordance with Siemsen experience and standard testing procedures PICTURE 01 01 Lid 02 Liquid Chamber 03 Motor Support Flange 04 Motor Housing 05 Bas...

Страница 6: ...nd pins Pic 02 one of them is ground It is mandatory the three pins to be duly connected before to start the machine 850 mm TABLE 01 CARACTER SITCAS UNIDADE ESB Average Production Oranges min 15 Volta...

Страница 7: ...ntact with the food to be processed shall be washed with water and soap See item 3 3 Cleaning 3 Operation 3 1 Starting The extractor shall be perfectly stable Remove the Lid N 01 Pic 01 Be assured the...

Страница 8: ...ent Below find the procedure to remove the moving parts 3 3 1 Switch OFF the machine and unplug it 3 3 2 Remove the Lid 01 pict 01 the Crown 09 or 10 Pict 01 and after remove the Liquid Chamber 02 Pic...

Страница 9: ...in contact with oxygen allows the formation of a very thin protective coat This protective coat is formed through the whole surface of the steel blocking the action of external corrosive agents When t...

Страница 10: ...ly switch the machine o Use recommended or equivalent lubricants oils or greases Avoid mechanical shocks once they may cause damages or bad functioning Avoid water dirt or dust contact to the mechanic...

Отзывы: