
Skylab M&C Technology Co., Ltd
11 / 30
VG05-DA-001,A/0
VG05-DA-001,A/
0
c.Press evenly for 5-10 seconds, make VG05 bottom side and 3M tape fully bonded.
d. Remove the protective oilpaper on the other side of the 3M tape and install VG05 to target installation
location (if there is dust or grease stain in the target location, it needs to be cleaned and dried in before
install). Press evenly for 5-10 seconds.