SJ46 AJ, SJ51 AJ, SJ63 AJ
213210AAAA
37
Section 4 – Inspections Before Operation
4.1 Operator’s responsibility
Do these tasks before each work shift and in this
sequence:
1. Visual and daily maintenance inspections
(refer to
Section 4.2
).
WARNING
Do an inspection on the MEWP for damage or
loose or missing parts. If damage is found, lock
and tag the MEWP and remove it from service. If
you do not obey, there is a risk of death or serious
injury.
2. Function tests
(refer to
Section 4.3
).
Refer to
Section 4.4
for a checklist of the inspection
items.
WARNING
If the MEWP is damaged or has been modified
from the initial factory-delivered condition, without
permission from Skyjack, lock and tag the MEWP.
Remove the MEWP from service. If you do not
obey, there is a risk of death or serious injury.
Repairs to the MEWP are tasks only for a qualified
service technician. Do the visual and daily
maintenance inspections and function tests again
after the repairs.
Scheduled maintenance inspections are a task only
for a qualified service technician.
Содержание SJ46 AJ
Страница 1: ...OPERATION MANUAL SJ46 AJ SJ51 AJ SJ63 AJ ARTICULATING BOOMS 213210AAAA December 2019 AS...
Страница 4: ...213210AAAA SJ46 AJ SJ51 AJ SJ63 AJ 4 Notes...
Страница 14: ...213210AAAA SJ46 AJ SJ51 AJ SJ63 AJ 14 Notes...
Страница 20: ...213210AAAA SJ46 AJ SJ51 AJ SJ63 AJ 20 Notes...
Страница 76: ...213210AAAA SJ46 AJ SJ51 AJ SJ63 AJ 76 Notes...
Страница 77: ...SJ46 AJ SJ51 AJ SJ63 AJ 213210AAAA 77 Section 7 Technical Diagrams and Specifications...
Страница 118: ...213210AAAA SJ46 AJ SJ51 AJ SJ63 AJ 118 Notes...
Страница 119: ......
Страница 120: ...www skyjack com...