37
SJ12, SJ16
213721AAA
Visual and daily maintenance inspections
Section 4 – Inspections Before Operation
14
4.2-8 Lift mechanism
11
Mast assembly
▪
Make sure the mast assembly shows no signs
of visible damage, deformation, or cracks in
the weldments.
1.
Complete the Function Tests in
Section 4.3
.
before proceeding to the next step.
2.
Raise the platform.
12
Wear pads
▪
Make sure the bolts are tight.
▪
Make sure there are no loose or missing parts.
▪
Make sure there is no visible damage.
13
Chains
▪
Make sure the chains are correctly attached.
▪
Make sure the bolts are tight.
▪
Make sure there are no loose or missing parts.
▪
Make sure there is no visible damage.
4.2-9 Optional equipment and
attachments
14
Flashing lights
▪
Make sure there are no loose or missing parts.
▪
Make sure there is no visible damage.
11
12
13
Содержание SJ12
Страница 1: ...OPERATION MANUAL VERTICAL MAST 213721AAA September 2019 ANSI CSA SJ12 SJ16...
Страница 4: ...4 SJ12 SJ16 213721AAA Notes...
Страница 8: ...8 SJ12 SJ16 213721AAA Notes...
Страница 14: ...14 SJ12 SJ16 213721AAA Notes...
Страница 20: ...20 SJ12 SJ16 213721AAA Notes...
Страница 58: ...58 SJ12 SJ16 213721AAA Notes...
Страница 64: ...64 SJ12 SJ16 213721AAA Notes...
Страница 80: ...80 SJ12 SJ16 213721AAA Notes...
Страница 82: ...82 SJ12 SJ16 213721AAA Notes...
Страница 83: ...Cancer and Reproductive Harm https www p65warnings ca gov WARNING...
Страница 84: ...www skyjack com...