SECTION 2, Page 13
SJ 600, 800 & 1000 Series
122883AH
May 2002
2
SECTION 2
OPERATION
Operating Controls Identification
The following descriptions are for identification,
explanation and locating purposes only. A qualified
operator MUST read and completely understand
these descriptions before operating this work
platform. Procedures for operating this work platform
are detailed in the
“
OPERATING
PROCEDURES
”
section. Both standard and optional controls are
identified in this section. Therefore, some controls
may be included that are not furnished on your work
platform.
Base Controls
Electrical Panel
Figure 2-1. Electrical Panel
Electrical Panel
- This control station is located in the
Hydraulic/Electric Side Cabinet. It contains the
following controls:
1.
Up Push-Button Switch
- This push-button switch
will raise the platform to desired height.
2. Down Push-Button Switch
- This push-button
switch will lower the platform to desired height.
3. Hour meter
- This gauge records engine running
time.
4. 20 Amp Circuit Breaker Resets
- In the event of
a power overload or positive circuit grounding, circuit
breaker will pop out.
Emergency Battery Disconnect Switch
Figure 2-2. Emergency Battery Disconnect Switch
1. Emergency Battery Disconnect Switch
Located
at the front of the Hydraulic/Electric Side Cabinet, this
switch when in the “OFF” position, disconnects power
to all circuits. Switch MUST be in “ON” position to
operate any circuit.
2
1
4
3
1