background image

Overview 

This document provides integration, installation and usage instructions for the 
SkydioLink 5GHz Radio (FCC 2ATQRSMO5GV1 / IC 25280-SMO5GV1).  

Module Integration 

Pinout & power requirements 

All module power and control signals are passed from the end device to the 
module over J9800, following the below pinout: 

 

Detail on pin-out requirements: 

 

 

 

 

Pin Number 

Required Signal 

Purpose 

1, 3, 5, 7 

5V (780 mA minimum)  5V Supply for RF front end modules 

2, 4, 6, 8 

3.3V 

3.3V Supply for Switcher & QCA617A 

 

Unused GPIO 

10 

 

1.8V Supply for QCA6174A 

21 

 

Unused GPIO 

25 

 

Unused GPIO 

27 

 

SDIO Data (0) from Host to WiFi  

29 

 

SDIO Data (1)) from Host to WiFi  

31 

 

SDIO Command  from Host to WiFi  

32 

 

SDIO Data (2) from Host to WiFi  

33 

 

WiFi enable signal from Host 

34 

 

SDIO Data (3) from Host to WiFi  

35 

test point 

36 

 

SDIO Clock from Host to WiFi  

11 - 20, 23, 23, 26, 28, 30, 37 - 40 

Ground 

Содержание SkydioLink

Страница 1: ...SkydioLink 5GHz Radio User Manual version 1 0 2021 03 16 ...

Страница 2: ...Overview 3 Module Integration 3 Pinout power requirements 3 Boot Sequence 4 Module Mechanical Integration 4 Antenna Connectors 5 Thermal Management 5 Usage Guidelines 6 Regional Settings 6 Mechanical Requirements 6 Compliance Information 7 ...

Страница 3: ... on pin out requirements Pin Number Required Signal Purpose 1 3 5 7 5V 780 mA minimum 5V Supply for RF front end modules 2 4 6 8 3 3V 3 3V Supply for Switcher QCA617A 9 Unused GPIO 10 1 8V Supply for QCA6174A 21 Unused GPIO 25 Unused GPIO 27 SDIO Data 0 from Host to WiFi 29 SDIO Data 1 from Host to WiFi 31 SDIO Command from Host to WiFi 32 SDIO Data 2 from Host to WiFi 33 WiFi enable signal from H...

Страница 4: ...irose DF30FC 40DP 0 4V on the lower side of the module All power and signal lines are passed via J9800 and J9801 is only used to secure the module in place instead of using screws When installing the module it is important to ensure that the technician using ESD protection On the end device the spacing and board to board MPN must match the module side specifications Mating board to board type DF30...

Страница 5: ...pes and gains must follow the FCC IC regulatory filings submitted by Skydio Thermal Management In order to prevent overheating when operating at high power levels it is important to move heat out of the module It is recommended to heat sink via the shield can on the top of the module which has a direct thermal interface to the radio front end module components that generate the most heat An exampl...

Страница 6: ...e used to ensure that these are followed 1 During a factory installation set the power tables based on the intended country of sale for the specific end device SKU 2 Use GPS data from the host device to select a specific power table to be referenced This is recommended for devices that are portable Note that the end device ultimately controls power levels frequency band and other radio settings an...

Страница 7: ...wing two conditions 1 This device may not cause harmful interference and 2 this device must accept any interference received including interference that may cause undesired operation This equipment complies with FCC radiation exposure limits set forth for an uncontrolled environment The distance between user and products should be no less than 20cm The end user must follow the specific operating i...

Отзывы: