1.5 OPERATIONS SCHEDULING
Before beg nn ng the assembly, t must be made clear, n one’s own nterests, wh ch are the construct onal con-
d t ons and cond t ons relat ng to the space ava lable, n order to carry out the assembly works n a safety con-
d t ons and follow ng a log cal order.
It s therefore adv sable, cons der ng all the g ven c rcumstances, to mentally s mulate the var ous processes
before the assembly act v ty s ncons derately or hast ly undertaken.
On rece pt of the supply, t s necessary to check the goods, by compar ng each s ngle part w th the purchase
order, n order to ver fy the r conform ty and completeness.
The data conta ned n the type-plate have to be compared w th the order.
1.6 TYPE-PLATE, TEST MARK, IDENTIFICATION
The type-plate of the OVERSPEED GOVERNOR s attached to the structure on the s de.
The reta ler of the plant s respons ble for t be ng leg ble.
7
2021
Sky Elevator