![SKLZ PRO TRAINING GOAL Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/sklz/pro-training-goal/pro-training-goal_getting-started_1288728002.webp)
1
3
5
2
4
6
Carefully remove goal from storage bag (A) and unroll net from base
frame (B). Net is permanently attached to the frame for easy setup.
Roll frame so it lays with rubber feet facing down. Unlock and unfold
front arms away from you until they lock into place.
Attach net to tops of support poles by inserting the pins at the top of
the pole into the clips attached to the net. Connect the front of the net
to the taller section of the Dual Tension-Tite
TM
support poles first, then
the back second. Follow the same order on the opposite side. For taller
goal sizes, you may need to lean the goal forward in order to reach top
corners. Be careful not to let go until the pin is fully inserted to avoid
injury. Connect the bottom of the posts to the frame by hooking the
bottom loop to the front of the post. Use ground stakes (D) to secure
the assembled goal in place for use.
Unfold two side legs of the base frame by swinging them left and right
from center hinge until they lock into place.
Assemble the Dual Tension-Tite
TM
support poles (C) and insert into
each of the rear corner joints of the base frame and lock into place.
Poles will fit in either side. The segments of these support poles are
permanently connected using elastic cords to simplify assembly.
Disassemble your goal by reversing the above procedure. Begin by
detaching the net from the support poles by pulling the pins from the
corners. Disassemble the support poles and fold connected segments
together. Use the silver release buttons to fold front arms back and to
slide telescoping sections together. Fold base frame at center hinge
and roll net around frame. Carefully place into storage bag.
VISIT SKLZ.COM FOR INSTRUCTIONAL VIDEO AND CONTENT
GETTING STARTED
IN THE BOX
STORAGE BAG
A
BASE FRAME WITH
ATTACHED NET
B
B
DUAL TENSION-TITE
™
SUPPORT POLES (2)
B
C
GROUND STAKES (2)
D