SKLZ KICK-OUT Скачать руководство пользователя страница 2

UNLOCKED

UNLOCKED

LOCKED

LOCKED

1.

  Attach the bottom left chute (A) to top left chute (C) by placing the 

knobs from part A into the openings in part (C). Once in place, slide 
them into the locking position. Repeat to connect the bottom right 
chute (B) and the top right chute (D).

3.

  Place the assembled chute from the previous step around the ring (E) 

and twist into place.

5.

  Lower your height-adjustable hoop or get on a ladder. Clip the plastic 

hooks onto the rim from the inside with even spacing. The net will be 
on the inside of the Kick-Out.

ASSEMBLE CHUTE

ATTACH CHUTE TO RING

SETUP AND USE

2.

  Connect the two pieces that were just assembled by placing the 

knobs from the right side of the chute into the openings on the left 
side of the chute. Once in place, slide them into the locking position. 

4.

  Secure the chute to the ring (E) by using the ring clips (F) and screws 

(G)

. The ring clips will clip into the ring, insert screw (G) into the ring 

and tighten to attach the chute. Repeat on other ring clips.

6.

  Grab the lip at the bottom of the chute and rotate to the position 

you’d like the ball returned to.

BOTTOM 

LEFT

CHUTE

BOTTOM 

RIGHT

CHUTE

TOP 

LEFT

CHUTE

TOP 

RIGHT

CHUTE

RING

RING CLIP (2)

SCREWS (4)

A

D

C

B

A

E

B

C

D

E

F

G

GETTING STARTED

IN THE BOX

VISIT SKLZ.COM TO LEARN MORE

Отзывы: