29
GB
Assembly instructions
Before starting to assemble we recommend to look for a place with sufficient space. Use a floor protection.
Remove all parts from the carton and spread them on the floor. Check according to the part-list in this ma-
nual, if all parts are complete. Perhaps some parts are already pre-assembled for your convenience.
For your safety in some cases lock nuts were used. Maybe it is a little difficult to screw them tightly onto
the respective screws, but they will not get loose easily (to ensure a safe connection). If you should loose
and fix those lock nuts several times, they will lose this lock mechanism. In this case you should use new lock
nuts of same size.
We recommend to use the provided tools to set-up this device and to set-up the device with 2 persons.
Step 1
Fix the front stabilizer (3) on front part of main frame using 2 screws (4), 2 washers (5) and 2 nuts (6). Then
screw in the connecting screw (24) into the sliding frame bottom as shown.
Содержание VEIEN
Страница 22: ...22 Explosionszeichnung...
Страница 23: ...23 DE...
Страница 46: ...46 Exploded diagram...
Страница 47: ...47 GB...
Страница 70: ...70 Vue explos e...
Страница 71: ...71 FR...